All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Year18RequiredICTemplate2650.xlsx |
ElDoradoWirelessUpgradeSolutions.docx |
ElDoradoFloorPlans.docx |
Answer:
We're seeking the purchase, installation and configuration of the equipment. No managment at this point.
Answer:
Extreme is preferred, we are looking into setting up a site visit the first week we are back and will post an update with a site visit date as soon as we have one available.
Answer:
They have been added as an attachment to this IFCB
Answer:
At this point we’re going to decline to allow demonstrations of the products.
Answer:
We would like to see both one and three year pricing options. The reason for the 250 client licenses is for the end-users connecting to the wireless. The wireless controllers require a license for the end points and licenses for the wireless clients (end-users). The client licenses are usually concurrent licenses. Even though these are concurrent there is always a chance that we can run out of client licenses, if we do not purchase enough of them.