All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
1. What time frame are we looking at for this?
It will be based on when we are awarded. If we are awarded in the first round then we would like a Summer install.
The switches need to go where they are needed. We do not have a specific place in mind just where they are needed on that campus. Please include patch cords
We are adding drops where they are needed. Existing drops should be left alone.
Bonham High School - 516 L H Rather - 276 I W Evans - 396 Finley Oates - 547 and Bailey Inglish - 180
Yes we would like them renewed with e-rate funds and we currently license for 5 years.
Upgrade UPS' as necessary. Which ever way is needed, with or without rack mount.
No.
We will not be replacing any switches we are adding them to our current ones.
BONHAMISDCATEGORYTWOPROJECT.docx |
BonhamC2Project.xlsx |
BonhamC2ProjectUpdate.pdf |
Answer:
We currently have iPhones and standard cell phones. We are currently contracted with 20,000 monthly minutes and would like to stay in that range.
Answer:
We currently have Meraki Access points and HP Switches. Yes, we would prefer to stay with the same manufactures. Per E-rate rules bids for functionally equivalent equipment will be accepted.
Answer:
The quantities of network drops should reflect what is on the spread sheet at the beginning of the packet. The number of drops there do include the drops needed for the AP's.
Answer:
Not this year
Answer:
Yes, our current models are ac.