All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
Category Two:
Vendors wishing to bid on internal connections can attend a voluntary site visit on January 12th, 2026 from 8am-11am. Vendors will meet at GRISD, 108 Avenue C, Grandfalls TX 79742. Vendors will meet with Travis Brown.
INTERNAL CONNECTIONS
Full turnkey installation required and listed & priced separately. A map is available for download along with this IFCB.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Antennas, Connectors and Related Components |
3 |
HPE Aruba AP Mounting Bracket Individual (10 pack) (AP-MNT-B, ceiling tile, thick) |
|
Antennas, Connectors and Related Components |
3 |
Oberon Right Angle Ap Wall Mount – AP-615 |
|
Cabling |
3 |
3 cabling runs: 2 x approx. 50 ft, 1 x approx. 100-200 ft |
|
Switches |
5 |
HPE Aruba 6200F 48G Class4 PoE 4SFP+ 740W Switch with 5 year licensing |
|
Switches |
3 |
HPE Aruba 6200F 24G Class4 PoE 4SFP+ 370W Switch with 5 year licensing |
|
Switches |
2 |
HPE Aruba 6100 12G CL4 2SFP+ 139W Switch with 5 year licensing |
|
Modules, GBIC, transceivers |
8 |
10Gb MM SFPs compatible with HPE Aruba 6XXX 48G Switches |
|
Cabling |
7 |
HPE Aruba 10G SFP+ to SFP+ 1m DAC Cable compatible with Aruba 6XXX switches |
|
Cabling |
1 |
HPE Aruba 10G SFP+ to SFP+ 3m DAC Cable compatible with Aruba 6XXX switches |
|
UPS/Battery Backup |
1 |
APC Smart-UPS X, Line Interactive, 3kVA, Rack/tower convertible 2U, 100V-127V |
|
Wireless Access Points |
30 |
HPE Aruba AP-615 Campus AP with 5 year licensing |
|
Wireless Bridge |
1 |
Proxim Wireless 902-00857 Link,867Mbps, MIMO2x2,22dBi |
|
Antennas, Connectors and Related Components |
2 |
Proxim 235-00001 Gigabit PoE Surge Protector Shielded |
NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
All WAPs must be compatible with existing Aruba Central management for seamless management with existing other HPE hardware.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
| 2026_C2_Bidding_Instructions_218.pdf |
| GRANDFALLS_ROYALTY_C2_COVER_PAGE.pdf |
| Grandfalls_Royalty_ISD_Old_Wireless_Map.pdf |
Answer:
Installation services (listed as turnkey on the 470) include the actual physical install, configuration brought over from prior switches/APs, and cable patching into those new switches, along with unracking of old hardware