All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Clinton Co R-III School District
IFCB Posted : Dec 18, 2025
Bid Deadline : Tuesday, Jan 20, 2026

Questions Due By : Monday, Dec 22, 2025
Applicant Address : Plattsburg, MO 64477
IFCB ID : 260011071

IFCB Requirements :

·       Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·      For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·       Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·       Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·       By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·       Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·       Contracts must not prohibit SPIN changes.

 

·       Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·       Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·       All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·       All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·       If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C and/or Project D.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


Services and Equipment Requested :

UPDATE 12/23/25 - THE BID DEADLINE HAS BEEN UPDATED TO 1/20/26.
WHEN QUOTING ROUTER - MX250 OR MX250, PLEASE INCLUDE QUOTES FOR 1 AND 5 YEAR LICENSING.

Category Two:

INTERNAL CONNECTIONS

IC PROJECT A – 1 YR LICENSING

One year licensing option for existing equipment.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switch licensing

3

MS220-48FP

Switch licensing

13

MS225-48FP

Switch licensing

1

MS220-8P

WAP Licensing

70

MR Enterprise

 

NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Equipment must be compatible with existing Meraki network.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

IC PROJECT B – 5 YR LICENSING

Five year licensing option for existing equipment.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switch licensing

3

MS220-48FP

Switch licensing

13

MS225-48FP

Switch licensing

1

MS220-8P

WAP Licensing

70

MR Enterprise

 

NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Equipment must be compatible with existing Meraki network.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

IC PROJECT C – NETWORK EQUIPMENT W/INSTALL

IC PROJECT C includes installation/configuration of the equipment listed below. The district will move forward with IC PROJECT C or IC PROJECT D, not both.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Router

1

Meraki MX250 or MX450

Switches

1

MS130-12X or MS130-8FP, with 5 year licensing

Wireless Access Points

40

MR56, no licensing needed.

 

NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Equipment must be compatible with existing Meraki network.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

IC PROJECT D – NETWORK EQUIPMENT W/O INSTALL

IC PROJECT D is for hardware only, do not include install charges. The district will move forward with IC PROJECT C or IC PROJECT D, not both.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Router

1

Meraki MX250 or MX450

Switches

1

MS130-12X or MS130-8FP, with 5 year licensing

Wireless Access Points

40

MR56, no licensing needed.

 

NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Equipment must be compatible with existing Meraki network.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C and/or Project D.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2026_C2_Bidding_Instructions_211.pdf
CLINTON_CO_R3_C2_COVER_PAGE.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




To ensure our bid pricing is accurate and fully responsive for the Meraki renewal licensing under: IC Project A – 1 Year Licensing IC Project B – 5 Year Licensing please confirm the following: What is the District’s current Meraki organization co-term (license) date? Please confirm the license tier required for renewal (e.g., MR Enterprise for wireless access points and the applicable MS license level for switches). Should renewal pricing be quoted as a co-termed renewal to the existing organization date, or as a new 1-year / 5-year term starting upon award or service start? Are any of the listed devices currently unlicensed, expired, or partially licensed due to mid-term additions that should be accounted for in renewal pricing? Please confirm that the listed quantities (3× MS220-48FP, 13× MS225-48FP, 1× MS220-8P, and 70× MR) represent the complete set of devices to be renewed under this project. Thank you for the clarification.

Answer:
To ensure our bid pricing is accurate and fully responsive for the Meraki renewal licensing under:
IC Project A – 1 Year Licensing
IC Project B – 5 Year Licensing

please confirm the following:
What is the District’s current Meraki organization co-term (license) date?
- Co-Term license is set to expire June 6 2026

Please confirm the license tier required for renewal (e.g., MR Enterprise for wireless access points and the applicable MS license level for switches):
- The license tiers listed under IC Project A and B are correct.  

Should renewal pricing be quoted as a co-termed renewal to the existing organization date, or as a new 1-year / 5-year term starting upon award or service start?
- Renewal pricing should be quoted as a co-termed renewal on the expiration date.

Are any of the listed devices currently unlicensed, expired, or partially licensed due to mid-term additions that should be accounted for in renewal pricing?
- No

Please confirm that the listed quantities (3× MS220-48FP, 13× MS225-48FP, 1× MS220-8P, and 70× MR) represent the complete set of devices to be renewed under this project.
- These numbers are correct