All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT C ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C and/or Project D. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project E and/or Project F. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
Category Two:
MANDATORY SITE VISIT
Vendors wishing to submit bids for category two projects must attend one of two mandatory site visits. The site visits will be held on October 22nd, 2025 and October 29th 2025. Both will begin at 10 am. Vendors will meet at the Technology Office, 209 Cedar Street, Dardanelle, AR 72834. Vendors will meet with Jon-Nathan George or Drew Laughinghouse. Bids from vendors who did not attend either of the site visits will be disqualified.
INTERNAL CONNECTIONS
IC PROJECT A – FIBER RUNS
Installation needed for Project A. Maps are available for download along with this IFCB. Bids from vendors who did not attend either of the site visits will be disqualified.
|
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
|
Cabling |
1 |
12 stand Single Mode Fiber run from our High School Library Data Rack to our ALE building. The Fiber needs to be bored underground (parking lots between buildings) in 2 inch conduit. Map included. Map show possible path but not required path. |
|
Cabling |
1 |
12 strand Single Mode Fiber run from our High School Library Data Rack to our Football Field House and an additional 12 strand Single Mode Fiber run from our High School Library Rack to our Press box. Suggested path, but not required, is to go from our Library Rack to our AGRI building in existing conduit. There is room for these fiber runs in the conduit. Then bore new underground conduit to the Field house. Then continue on boring to the press box for the final fiber connection. |
|
Cabling |
1 |
24 Strand Single Mode Fiber run from our High School Rack to our High School Wing Rack. This is replacing the current old fiber run. |
INTERNAL CONNECTIONS
IC PROJECT B – UPS DEVICES
No installation needed for Project B. Bids from vendors who did not attend either of the site visits will be disqualified.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
UPS/ Battery Backup |
6 |
6000VA or larger – 240V Network Controllable UPS System - - LiFePO4 Lithium Battery ( or comparable technology) Battery Backup UPS. Must have extended battery module option. Rack Mountable. |
|
UPS/ Battery Backup |
8 |
3000VA or larger - 120v Network Controllable UPS System - LiFePO4 Lithium Battery ( or comparable technology ) Battery Backup UPS. Must have extended battery module option. Rack Mountable. |
|
UPS/ Battery Backup |
6 |
Extra Battery Module for 6000VA system that is quoted (may quote multiple expansion sizes) |
IC PROJECT C – NETWORK EQUIPMENT
No installation needed for Project C. Bids from vendors who did not attend either of the site visits will be disqualified.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Switches |
4 |
5520-24x Extreme Switching 5520 24 1Gb/10Gb SFP+ Ports – Dual 350w power supplies – with 5 years of Extreme |
|
Switch Licensing |
95 |
Extreme IQ Licenses for existing switches – 3 year |
|
UPS/Battery Backup modules |
2 |
N1C 48V 100Ah LiFePO4 Lithium Battery Modules |
|
UPS/Battery Backup modules |
2 |
N1C 48V 50Ah LiFePO4 Lithium Battery Modules |
|
Wireless Access Points |
10 |
Extreme Indoor Aps with 5 years of Extreme Cloud IQ licensing |
NOTE: We are requesting switch and/or WAP licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
All WAPs must be compatible with existing Extreme Cloud IQ.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT C ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC PROJECT D – FIREWALL LICENSING
No installation needed for Project D. Bids from vendors who did not attend either of the site visits will be disqualified.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Firewall Service/Components |
1 |
FortiGate License (UTP) for 601F FortiGate Firewall – 3 year |
NOTE: We are requesting firewall licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT C ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C and/or Project D. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
BASIC MAINTENANCE OF INTERNAL CONNECTIONS:
BMIC PROJECT E – NETWORK EQUIPMENT
The district would like a manufacturer’s support contract for these items.
Bids from vendors who did not attend either of the site visits will be disqualified.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Switches |
4 |
5520-24x Extreme Switching 5520 24 1Gb/10Gb SFP+ Ports – Dual 350w power supplies – with 5 years of Extreme |
|
Switch Licensing |
95 |
Extreme IQ Licenses for existing switches – 3 year |
|
Wireless Access Points |
10 |
Extreme Indoor Aps with 5 years of Extreme Cloud IQ licensing |
BMIC PROJECT F – FIREWALL LICENSING
The district would like a manufacturer’s support contract for these items.
Bids from vendors who did not attend either of the site visits will be disqualified.
|
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Firewall Service/Components |
1 |
FortiGate License (UTP) for 601F FortiGate Firewall – 3 year |
DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project E and/or Project F. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
DISQUALIFICATION FACTOR BMIC: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
| 2026_C2_Bidding_Instructions_73.pdf |
| DARDANELLE_C2_COVER_PAGE2.pdf |
| FIBER_RUNS.pdf |
Answer:
Would we accept N1C bids on the UPS systems?
We will accept cost-effective bids from any valid vendor.
How many Handholes would you want on the Fiber run from the High School to the Press box/Field House? And can fiber be run to the front side of the field house and go through it?
Yes, the fiber can be run to either side of the field house and run through it. We would want at least one Handhole if it were run to the Football side or two if it were to the HWY side of the Field House. One for each side. (2ft x 3ft will be large enough)
What size conduit for Fiber runs?
We prefer 2-inch conduit for all the fiber runs.
Which box should the Fiber come in?
We prefer the Fiber to be installed on a rack-mount LU. We will provide Network racks in all the necessary locations.