All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Stockton R-1 School District
IFCB Posted : Oct 9, 2025
Bid Deadline : Tuesday, Nov 25, 2025

Questions Due By : Tuesday, Oct 28, 2025
Applicant Address : Stockton, MO 65785
IFCB ID : 260002601

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, B and/or C.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

·         DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire Project D and/or E.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


Services and Equipment Requested :

Category Two:

VOLUNTARY SITE VISIT

Vendors wishing to bid on C2 can attend a voluntary site visit on October 27th, 2025.  Vendors should RSVP to Neal Cross at ncross@stockton.k12.mo.us to set up a time for a site visit October 27th, 2025. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.

 

INTERNAL CONNECTIONS

The district would like to standardize on UPS’s used in several buildings some with more than one server/switch room. A key feature regardless of the capacity the location needs would be remote management. We want one place to check on the status of the UPS and want to get alerts when there are problems (power outage, battery status, etc.)

 

Installation and configuration needed and confirm working order for remote management. If licensing is required, please provide a 5 year option.

 

IC PROJECT A – APC SOLUTION

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

UPS/Battery Backup

8

APC

 

 

IC PROJECT B – VERTIV SOLUTION

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

UPS/Battery Backup

8

VERTIV

 

 

IC PROJECT C – CYBERPOWER SOLUTION

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

UPS/Battery Backup

8

Cyberpower

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, B and/or C.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

 

Managed Internal Broadband Service (MIBS):

MIBS PROJECT D – FIREWALL

The district would like MIBS services for the following existing equipment:

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall Service and Components

1

Fortinet FG101F

 

 

MIBS PROJECT E – EXISTING EQUIPMENT

The district would like MIBS services for the following existing equipment:

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

5

Aruba J9727A

Switches

5

Aruba J9772A

Switches

5

Aruba JL356A

UPS/Battery Backup

2

SMT1500RMI2UC

UPS/Battery Backup

2

SUA1500RM2U

Wireless Access Points

35

Aruba 305

Wireless Access Points

35

Aruba 303

Wireless Controller

1

Aruba 305

 

 

DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire Project D and/or E.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

STOCKTON_C2_COVER_PAGE2.pdf
2026_C2_Bidding_Instructions_68.pdf

Questions Received with Applicant Answers   ( Ask Questions? )