All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Lone Star School District 8
IFCB Posted : Sep 4, 2025
Bid Deadline : Thursday, Oct 16, 2025

Questions Due By : Saturday, Sep 13, 2025
Applicant Address : Sapulpa, OK 74066
IFCB ID : 260000997

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


Services and Equipment Requested :

09/05/25 UPDATE: ADDITIONAL INFORMATION REGARDING THE EQUIPMENT REQUESTED FOR MIBS ARE AVAILABLE FOR DOWNLOAD ALONG WITH THIS IFCB. 

Category Two:

 

Managed Internal Broadband Service (MIBS):

The district would like MIBS services for the following existing equipment

 

Type of Equipment

Quantity Vendor Should Bid

Preferred Make/Manufacturer

Firewall Service and Components

1

Palo Alto 850

Switches

8

Juniper EX3400

Switches

5

Aruba 6200F

Switches

2

Aruba 2930F

Wireless Access Points

26

Aruba 305

Wireless Access Points

38

Aruba 650

Wireless Controller

1

Aruba 7030

Wireless Controller

1

Aruba 7010

 

DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2026_C2_Bidding_Instructions_.pdf
LONE_STAR_C2_COVER_PAGE3.pdf
MIBS_2025_Lone_Star.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




are they looking for 12 or 36 months support or both? Can we get s/n of devices as manufactures require that for quoting.

Answer:

12 month contract with the option for two 1 year voluntary renewals. Serials numbers have been added as an attachment to the IFCB.

Can you have the ISD give the PaloAlto 850 S/n ? they are missing of the sheet

Answer:

My apologies.

 

Here is the SN:

011901010257