All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Gilmer ISD
IFCB Posted : Dec 1, 2023
Bid Deadline : Thursday, Jan 4, 2024

Questions Due By : Thursday, Dec 7, 2023
Applicant Address : Gilmer, TX 75644
IFCB ID : 240006723

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

 

·         LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

 

·         LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

 

·         SELF PROVISIONED NETWORK DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

 

 

·         DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Service providers are required to bid the entire hardware project. Bids for individual components of the project will be disqualified.

·         DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT:  The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bid disqualified.

 

·         DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 


Services and Equipment Requested :

UPDATE 12/7/23: The bid deadline has been extended to 1/4/2024.

UPDATE 12/6/2026:  Floor plans with drops/WAP locations have been attached. The orange dot is the drop, the blue square is the WAP.

CATEGORY ONE

LEASED WIDE AREA NETWORK CIRCUIT

One connection any delivery/technology type.  Leased dark fiber bidders should bid two strands.  Lit leased fiber bidders should bid 10GB bandwidth.  The connection will be from the Admin Building, 245 Bradford, Gilmer, TX 75644, to the new ECC Building, 320 N Bledsoe St, Gilmer, TX 75644.

LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

SELF PROVISIONED NETWORK

The district will accept bids for any type of technology that can achieve their connectivity goals including fiber, wireless, purchased radio/wireless bridges, etc.  The connection will be from the Admin Building, 245 Bradford, Gilmer, TX 75644, to the new ECC Building, 320 N Bledsoe St, Gilmer, TX 75644.

SELF PROVISIONED NETWORK DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

OPERATIONS AND MAINTENANCE SERVICES

One connection from the Admin Building, 245 Bradford, Gilmer, TX 75644, to the new ECC Building, 320 N Bledsoe St, Gilmer, TX 75644.

C1 NETWORK EQUIPMENT

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

2

10 Gbps SFP + optics LC

 

COMPATIBILITY REQUIREMENT C1 NETWORK EQUIPMENT

Switches must be compatible with Ruckus switches.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Service providers are required to bid the entire hardware project. Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT:  The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bid disqualified.

CATEGORY TWO

INTERNAL CONNECTIONS

The district is replacing end of life switches at the High School campus.  They are also adding equipment for their new Early Childhood Center.  No installation is needed.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Racks

1

At least 10 U

Switches

14

Ruckus 48 port POE with 5 year licensing

UPS/Battery Backup

1

Eaton, 200W minimum.  120V – L5 -30P input. Rack mount.  Runtime 10+ minutes

Wireless Access Points

26

AP 4000 Extreme Networks with 5 year licensing

Cabling

40

Network drops for switches & WAPs

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT C2 INTERNAL CONNECTIONS

WAPs must be compatible with Extreme Cloud.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Gilmer_C1_Cover_Page.pdf
Gilmer_C2_Cover_Page.pdf
2024_C2_Bidding_Instructions108.pdf
Gilmer_ISD_ECC_DataDrops_Mock_Up_AP.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Can you please give lat/long of the location of the new ECC Bldg location? Thanks.

Answer:

Rack- Would you like a 2 or 4 post? Are there any size requirements other than at least 10U we need to be aware of? Switch- Is there a specific Switch you are requesting? Transceivers- Are you sure you only need 2 and not 14? The Transceivers have to match the model of switch so if a newer model of switch is bid you might need more. WAP- Would you be interested in Ruckus WAP's with a cloud controller to match your Ruckus switches? Thank you!

Answer:

Would you like a 2 or 4 post?  2 posts

Are there any size requirements other than at least 10U we need to be aware of?  Not that we know of

Is there a specific Switch you are requesting?  Ruckus ICX 7250-48P or 7150-48P

Transceivers – Only need 2

Would you be interested in Ruckus WAP with a cloud controller?  Vendors are allowed to bid for functionally equivalent equipment, but we do need that equipment to be compatible with our existing Extreme Cloud services.

1) Rack - Wall mount or Floor Mount? 2) Switches - Can you provide a model number for the 48 Port POE Ruckus Switches? Are all the switches in the MDF or in multiple IDF's? 3) Cablng - What is the typical lenght of the cable pull and are the ceilings removable tiles, locked tiles or solid? 4) Cabling - What are the cable terminating to, patch panels, WAP's or ?

Answer:

  1. Wall mount
  2. Ruckus ICX 7250-48P or 7150-48P- MDF location
  3. We have uploaded a map for the drops. Longest length of building 300 feet- Width (Front of building) 147.11 feet.
Patch panels, WAPs

What is the model of the Ruckus 48 port POE you are requesting?

Answer:

Ruckus ICX 7250-48P or 7150-48P

What is the vendor and model of the current EOL switches at the High School campus?

Answer:

Brocade/Ruckus ICX 6450-48P

For the Category 1 equipment (Switches): 1- What type of links (Cooper, fiber)? And what type of uplink? 2- If you have fiber, what type of fiber is in use(SMF-OS1/OS2, MMF- OM1, OM2, OM3, OM4)? 3- If using Fiber: what are the distances of the fiber runs)? 4- How many ports does the District need?

Answer:

1 & 2: Need copper ports with a SMF fiber uplink.

3: Uplink distance is roughly 2000 feet.

4: 48 copper ports and 4 SFP+ ports

Can clarify if the following equipment needs to be installed? Racks UPS Switches Access Points

Answer:

We do need installation for those items.