school Blue Ridge ISD
IFCB Posted : Jan 15, 2024
Bid Deadline : Tuesday, Feb 27, 2024

Questions Due By : Monday, Jan 22, 2024
Applicant Address : Blue Ridge, TX 75424
IFCB ID : 240013136

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project, Project A and/or Project B. Bids for individual components of the project will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.


Services and Equipment Requested :

UPDATE 2/23/24:  Bids will now be opened 3/1/24 at 9am at the Blue Ridge ISD Administration Building.

UPDATE 1/30/24: The bid deadline has been extended to 2/27/24.

UPDATE 1/19/24: The bid deadline has been extended to 2/16/24.

NOTE: This IFCB is a re-posting of 470/IFCB #240007065 due to no newspaper ads being run. If you previously bid on IFCB #240007065, you must submit a bid under this new IFCB #240013136.

 

INTERNAL CONNECTIONS

The district is requesting equipment to update network switches at the high school, middle school, and administration buildings. Please include installation and configuration costs.

 

Project A – 3-year licensing

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

12

HPE Aruba 48 port PoE or functional equivalent (include bids for 3-year licenses)

Cabling

12

Network drops

UPS/Battery Backup

8

APC Smart-UPS 1500

NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

Project B – 5-year licensing

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

12

HPE Aruba 48 port PoE or functional equivalent (include bids for 5-year licenses)

Cabling

12

Network drops

UPS/Battery Backup

8

APC Smart-UPS 1500

NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project, Project A and/or Project B. Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.


There is an additional document associated with this IFCB. Please click the buttons to download the document.

BLUE_RIDGE_C2_COVER_PAGE2.pdf
Blue_Ridge_Previous_IFCB_QandA.pdf
2024_C2_Bidding_Instructions149.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




--Do you need stacking (if so advise what length 1 meter or 3 meter) --Is there any need for copper or fiber SFP/SFP+ modules/transceivers? --If so, what type - Copper, Multi-mode Fiber or Single-mode Fiber? And quantity? --If so, what speed - 1G or 10G? And quantity?

Answer:

Question : --Do you need stacking (if so advise what length 1 meter or 3 meter) --Is there any need for copper or fiber SFP/SFP+ modules/transceivers? --If so, what type - Copper, Multi-mode Fiber or Single-mode Fiber? And quantity? --If so, what speed - 1G or 10G? And quantity?

 

Yes, we will need stacking for the switches. A 3 meter cable will be sufficient. We will need 5 10G multi-mode fiber SFP/SFP+ modules/transceivers. 

All same location? Replacements or new install? If replacement are we going to install in same rack and remove old ones or is there new rack space? If existing OR new are we moving/installing patch cords?

Answer:

The switches will be installed at 3 different locations. This is a replacement of our current core switches. The installation will be in the same rack and the old switches will be removed as part of installation. Patch cords will need to be moved to the new switches. 

1. How many multi-rate interfaces per switch? Will all 48 ports need to be multi-rate? 2. What is the multi-rate requirement? 2.5, 5, or 10 GB?

Answer:

Question 1: How many multi-rate interfaces per switch? 2

 

Question 2: Will all 48 ports need to be multi-rate? yes

 

Question 3: What is the multi-rate requirement? 2.5 and 10GB