school Santa Fe South Schools, Inc
IFCB Posted : Jan 9, 2024
Bid Deadline : Friday, Feb 16, 2024

Questions Due By : Tuesday, Jan 16, 2024
Applicant Address : Oklahoma City, OK 73129
IFCB ID : 240012272

IFCB Requirements :

·        Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

·       For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.

 

·        Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·        Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·        By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·        Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·        Contracts must not prohibit SPIN changes.

 

·        Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·        Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·        All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·        All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·        If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

·        E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

·        INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·        INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

·        LEASED LIT FIBER DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.

·        LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·        LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

·        The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.


Services and Equipment Requested :

UPDATE 1/19/24: Request for (qty 57) C2 switches changed from model Meraki MS130-48FP to MS130-48X. The bid deadline has been extended to 2/16/24.

Category 1

Internet Access – Please provide bids for 15 GB bandwidth to 6921 Plaza Mayor Blvd, OKC, OK 73149. District would like pricing for each tier of single/multiple-year contracts. Please indicate on your bid if you own the entire circuit or if you have to lease a portion (last mile) from a separate provider. Please include SLA.

E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

Leased Lit Fiber – 9 x 10 GB connections. District would like pricing for each tier of single/multiple-year contracts. Please indicate on your bid if you own the entire circuit or if you have to lease a portion (last mile) from a separate provider. Please include SLA.

Hub 6921 Plaza Mayor Blvd, OKC, 73149

1.      4712 S Santa Fe Ave

2.      5325 S Penn

3.      2222 SW 44th

4.      4825 S Shields Blvd

5.      7000 Crossroads Blvd, Ste. 4000

6.      4601 S Shields Blvd

7.      5000 S Santa Fe Ave

8.      7301 S Walker Ave

9.      735 SE 15th St

LEASED LIT FIBER DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

C1 Network Equipment

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

1

Meraki MS425-16 with PoE

Switches

10

Meraki C9300-M with PoE

 

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Service providers are required to bid the entire hardware project. Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT:  The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bid disqualified.

Category 2

Internal Connections – AP and switches will need to be installed and configured. Please include pricing for 3 year term for AP, switches and controller.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

1

Meraki MS425-16 with PoE

Switches

2

Meraki C9300-M with PoE

Switches

57

Meraki MS130-48FP with PoE
Meraki MS130-48X with PoE

Cabling

50

Data drops for two campuses

Antenna, Connectors and Related Components

46

Meraki Transceivers

Wireless Access Points

175

Meraki MR57

Wireless Controller

1

Meraki cloud controller

NOTE: We are requesting WAP, controller and switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

SANTA_FE_SOUTH_C1_COVER_PAGE.pdf
SANTA_FE_SOUTH_C2_COVER_PAGE1.pdf
2024_C2_Bidding_Instructions142.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Question regarding Category 2 equipment: Regarding 46 Transceivers for the Meraki switches you are requesting in Category 2, can you list what type of transceivers are needed? We understand that multiple types of transceivers may be needed based on type of fiber, length of run, speed, etc. Here is a table to help you. https://documentation.meraki.com/General_Administration/Cross-Platform_Content/Small-Form_Factor_Pluggable_(SFP)_and_Stacking_Accessories?file= See questions below regarding the “50 Data Drops for Two Campuses”: 1. Please confirm the quantity of data drops requested is for a total of 50 shared between two campuses, or is it for 50 data drops for each of two campuses? 2. Are you requesting plenum or non-plenum cable? 3. Are you requesting Category 6 or Category 6A cable? 4. Do you have a manufacturer specific brand / preference for the cabling? 5. Are you requesting patch cords for the 50 data drops? If yes, one or two per data drop? If two, a. Length for IT Closet / Equipment side? b. Length for end device? 6. Are there existing above and or below ceiling cable pathways to use for installation of new data drops? 7. Do the IT closets to receive the new data drops have space on the existing patch panels to support all new data drops, or will new patch panels be required? If new are needed, a. How many 24-port and how many 48-port in total? b. Modular or 110 style? 8. Will an indoor man lift be required and need to be provided by the cable drop installation vendor to reach high ceiling cable pathways (above 12’ feet) to install the new cabling? If yes, a. To reach what heights? b. At one or both campuses? 9. Will there be a need to provide and install conduit and or surface mount cable pathways (above and or below ceilings) for installation of new data drops? If yes, a. Can you provide estimates of total lengths needed for both conduit and surface mount raceway? b. Can you provide estimates of sizes needed for each? 10. Do you have floor plans available reflecting the IT closet and cable drop locations?

Answer:

Transceivers - 4 of Meraki Product ID MA-SFP-10GB-SR

42 of Meraki Product ID MA-CBL-TA-3M.

 

1. Please confirm the quantity of data drops requested is for a total of 50 shared between two campuses, or is it for 50 data drops for each of two campuses? 

Trinity Elementary 7301 S. Walker - 20 data drops

Shidler Elementary 735 SE 15th - 30 data drops

 

2. Are you requesting plenum or non-plenum cable? non-plenum cable

 

3. Are you requesting Category 6 or Category 6A cable? Category 6A

 

4. Do you have a manufacturer specific brand / preference for the cabling? No

 

5. Are you requesting patch cords for the 50 data drops? If yes, one or two per data drop? If two, a. Length for IT Closet / Equipment side? b. Length for end device? No

 

6. Are there existing above and or below ceiling cable pathways to use for installation of new data drops? No

 

7. Do the IT closets to receive the new data drops have space on the existing patch panels to support all new data drops, or will new patch panels be required? If new are needed, a. How many 24-port and how many 48-port in total? b. Modular or 110 style? New patch Panels needed. Modular 48 ports

 

8. Will an indoor man lift be required and need to be provided by the cable drop installation vendor to reach high ceiling cable pathways (above 12’ feet) to install the new cabling? If yes, a. To reach what heights? b. At one or both campuses? No

 

9. Will there be a need to provide and install conduit and or surface mount cable pathways (above and or below ceilings) for installation of new data drops? If yes, a. Can you provide estimates of total lengths needed for both conduit and surface mount raceway? b. Can you provide estimates of sizes needed for each? No


10. Do you have floor plans available reflecting the IT closet and cable drop locations? Yes – we can provide those to the winning vendor.