school Quapaw ISD 14
IFCB Posted : Nov 2, 2023
Bid Deadline : Tuesday, Dec 19, 2023

Questions Due By : Tuesday, Nov 21, 2023
Applicant Address : Quapaw, OK 74363
IFCB ID : 240003784

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

 

·         E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

 

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

 

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

 

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 


Services and Equipment Requested :

CATEGORY ONE

INTERNET ACCESS

The district currently has 1GB bandwidth and is considering upgrading.  Please provide pricing for 5GB and 10GB bandwidths.  The terminating address for this circuit is 305 West First Street, Quapaw, OK 74363.

E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.

INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

INTERNET ACCESS DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

LEASED LIT FIBER

The district is requesting bids for 1GB, 5GB, and 10GB bandwidths.  Please include pricing for leased switches.  The connection will be from the Elementary School, 101 McDonald Drive, Quapaw, OK 74363, to the Middle School, 305 West First Street, Quapaw, OK 74363.

NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

CATEGORY TWO

VOLUNTARY SITE VISIT

Vendors wishing to submit bids for Category Two can attend one of two voluntary site visits. The site visits will be held on 11/13/23 and 11/20/23. Both will begin at 10:30am. Vendors will meet at 305 West First Street, Quapaw, OK 74363, and check in with Joshua Fanning.

INTERNAL CONNECTIONS

The district wants to improve speed, dependability, and network access to the Elementary School.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

50

Cat6 network drops; this will be a rip/replace project to upgrade existing Cat5

Cabling

30

Network drops for new WAPs

Racks

1

No preference

 

Router

1

Meraki MS250

Switches

1

Meraki

Antennas, Connectors, and Related Components

2

GBICs

UPS/Battery Backup

1

No preference

Wireless Access Points

30

Meraki

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT

Equipment must be compatible with existing Meraki network infrastructure.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Quapaw_C2_Cover_Page.pdf
2024_C2_Bidding_Instructions83.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




GBICs What speed? What type of cable medium – Single Mode Fiber, Multi Mode Fiber, or Copper? UPS – What equipment is the UPS supporting? Need total load in Watts Plug type needed for the UPS? Cables – Do they need cat6 cables? What length? What color? Rack – You mention 10-12U, what is the maximum depth in inches do they need? Floor mount or wall mount?

Answer:

GBICs What speed? 10 Gbps Gbics

What type of cable medium - Single Mode Fiber, Multi Mode Fiber, or Copper? We are looking at all our options in this area.

UPS-What equipment is the UPS supporting? One switch with PoE capabilities supplying power to twelve access points.

Need total load in Watts Plug type needed for the UPS? 1200 watt on 110 plug

Cables - Do they need cat6 cables? What length? What color? Blue/Black/White CAT6 or higher varying lengths, (wiring a building...) not less than 2000 ft.  

Rack - You mention 10-12U, what is the maximum depth in inches do they need? Floor mount or wall mount?

We are looking for a wall mounted 12U no more than 24 inches from front to back.

 

In conclusion, we are looking to expand our network with "future-proofing" in mind. We are wanting as much infrastructure as possible to be capable of running 10 Gbps services.

Cabling: --Is a lift needed for any Cat6 cabling? --Are there maps showing data cabling locations and wireless cabling locations? --Ripping out existing Cat5 copper cabling may not be doable as cable could be wrapped around duct work, ceiling grid, and intertwined with intercom cable and fire alarm cable. For data cables, cut off at top of wall and remove cable in wall. Is this acceptable? Rack: --Previous Q/A has 12U wall mounted - is that an open frame rack or enclosed cabinet? --Is new rack replacing an existing rack/cabinet? Or establishing a new network closet? Switch: --Do you need a 24-port or 48-port? --How many years for Meraki subscription? --What are the current Meraki switch models that will be still be in the network at the ES? Wireless: --Are you replacing existing Meraki AP for new Meraki AP's in the Elem School? --Or are you adding 30 new Meraki AP's? --How many years for Meraki AP subscription? --Is a lift needed to install any of the AP's?

Answer:

Question : Cabling: --Is a lift needed for any Cat6 cabling? No lift should be required.

--Are there maps showing data cabling locations and wireless cabling locations?  No.

--Ripping out existing Cat5 copper cabling may not be doable as cable could be wrapped around duct work, ceiling grid, and intertwined with intercom cable and fire alarm cable. For data cables, cut off at top of wall and remove cable in wall. Is this acceptable? This is not ideal, but acceptable

Rack: --Previous Q/A has 12U wall mounted - is that an open frame rack or enclosed cabinet? --Is new rack replacing an existing rack/cabinet? Enclosed cabinet is preferred. This is a new installation.

Or establishing a new network closet? New network closet, new installation.

Switch: --Do you need a 24-port or 48-port? 48 port

--How many years for Meraki subscription? 3-5 years

--What are the current Meraki switch models that will be still be in the network at the ES? Our current switches are MS225-24P, Ms250-48FP, MS225-48FP. Current APs are CW9162i, MR33, MR76

Wireless: --Are you replacing existing Meraki AP for new Meraki AP's in the Elem School? Some will be replacements, while some are new additions.

--Or are you adding 30 new Meraki AP's? see above.

--How many years for Meraki AP subscription? 3-5 yrs.

--Is a lift needed to install any of the AP's? No lift is required. No ceilings exceed 8 ft.