All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Bixby ISD 4
IFCB Posted : Nov 1, 2023
Bid Deadline : Wednesday, Dec 13, 2023

Questions Due By : Friday, Nov 10, 2023
Applicant Address : Bixby, OK 74008
IFCB ID : 240003709

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

 

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

 

·         LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT B & PROJECT C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.


Services and Equipment Requested :

CATEGORY ONE

LEASED LIT FIBER

The district currently has 5 x 1GB connections and is considering upgrading bandwidth.  Please provide bids for 1GB, 5GB, and 10GB bandwidths.  The district prefers a five year contract.  All addresses are in Bixby, OK 74008.

1.       Bixby North Intermediate, 6941 E 121st S

2.       Bixby North Elementary, 7101 E 121st

3.       Bixby Central Intermediate, 9401 E 161st

4.       Bixby Central Elementary, 201 S Main St

5.       Bixby High School, 601 S Riverview

NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

CATEGORY TWO

INTERNAL CONNECTIONS

PROJECT A (Firewall)

Please include installation, activation, and initial configuration in your bid.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall Service and Components

1

Palo Alto/10G throughput min

NOTE: We are requesting firewall licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

PROJECT B (Network Refresh)

This project is a refresh of the district’s current set up.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

20

Aruba POE+ 48 Port, 10Gigabit SFP+ with licensing

Modules, GBIC, transceivers

20

Compatible with switches

UPS/Battery Back up

10

2U RMS, 1500VA, 1050W with 8 outlets, rackmount, minimum 7 minutes run time

Wireless Access Points

470

Aruba with licensing

NOTE: We are requesting WAP and switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT PROJECT B

WAPs must be compatible with existing Aruba 7220 mobility controller.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT B & PROJECT C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

PROJECT C (HS Project)

This project is for the new High School Building that is opening at the end of 2024.  The Cores Switch is planned for our main data center which connects all campuses.  Please include installation, activation, and initial configuration for the core switch in your bid.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

20

Aruba POE+ 48 Port, 10Gigabit SFP+ with licensing

Switch

1

Core Switch Aruba 6400 series or higher with licensing (with expansion modules included)

Modules, GBIC, transceivers

20

Compatible with switches

UPS/Battery Back up

10

2U RMS, 1500VA, 1050W with 8 outlets, rackmount, minimum 7 minutes run time

Wireless Access Points

130

Aruba with licensing

NOTE: We are requesting WAP and switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT PROJECT C

WAPs must be compatible with existing Aruba 7220 mobility controller.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT B & PROJECT C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Bixby_C2_Cover_Page.pdf
2024_C2_Bidding_Instructions79.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Do you require installation and configuration on PROJECT B (Network Refresh)?

Answer:

No, we do not require configuration and installation on Project B.

Concerning Networking for Project B and C: What type of fiber uplinks do you have between closets for Project B and C, so we can recommend the correct Transceivers? Will any of the switches in Project B and C be stacked and would you need DAC Cables? How Many will be stacked? Do you want to use existing access point licensing for Project B, or would you like to transition to Aruba Central? If you plan on using existing access point licensing for Project B, how many Access Point Licenses do you currently have? How many new access point licenses will you need for Project C at the new High School? Do you want to remain with your current controller based licensing for the access points or would you like to move to cloud based Aruba Central licensing model? Do you need 1G or 10GB Transceivers for the switches on Project B and C? Do you need Single Mode Transceivers or Multi Mode Transceivers for Project B and C? Are the non-Core switches needed in Project B and C access layer or aggregation layer switches? Do you need layer 3 on all switches?

Answer:

Concerning Networking for Project B and C: 

What type of fiber uplinks do you have between closets for Project B and C, so we can recommend the correct Transceivers? SFP+ 10G Single Mode

Will any of the switches in Project B and C be stacked and would you need DAC Cables?  No

How Many will be stacked?  Not certain at this time

Do you want to use existing access point licensing for Project B, or would you like to transition to Aruba Central? I believe we would use what we currently have for any replacements

If you plan on using existing access point licensing for Project B, how many Access Point Licenses do you currently have? 700

How many new access point licenses will you need for Project C at the new High School? 130

Do you want to remain with your current controller based licensing for the access points or would you like to move to cloud based Aruba Central licensing model?  Controller Based

Do you need 1G or 10GB Transceivers for the switches on Project B and C?  10 G

Do you need Single Mode Transceivers or Multi Mode Transceivers for Project B and C?  Single Mode

Are the non-Core switches needed in Project B and C access layer or aggregation layer switches?  Access 

Do you need layer 3 on all switches?  No, only on core switches

Concerning the Installation, activation, and initial configuration for Firewall in Project A: Do they require resources on site to assist with the install? What is the current firewall being replaced? How many Interfaces are on the current firewall? (Internal, ISP, DMZ, etc.) How many current ISP connections exist? How many current site-to-site VPNs exist? How many client-to-site VPNs exist? How many existing firewall Rules/Policies? How many NAT statements exist? How many Web content filtering profiles? How many Service Objects? How many Static Routes? How many UTM profiles? Is Intrusion Prevention (IPS) required? Is Antivirus required? How many Object Groups?

Answer:

Concerning the Installation, activation, and initial configuration for Firewall in Project A: 

 

Do they require resources on site to assist with the install? Yes

What is the current firewall being replaced? Fortigate

How many Interfaces are on the current firewall? (Internal, ISP, DMZ, etc.)  1 ISP 1 internal

 How many current ISP connections exist? 1

How many current site-to-site VPNs exist? None

 How many client-to-site VPNs exist? None

How many existing firewall Rules/Policies?  4

How many NAT statements exist?  6

How many Web content filtering profiles?  None 

How many Service Objects?  24

How many Static Routes? 4

How many UTM profiles? None

Is Intrusion Prevention (IPS) required?  Yes – please make sure you identify the cost as ineligible if that’s the case.

Is Antivirus required? Yes – please make sure you identify the cost as ineligible if that’s the case.

How many Object Groups? None

Are you tax free and willing to provide a tax free certificate? Do you want Aruba Central licensing or just the base license? Is there a specific POE budget for the switches? Do the switches need redundant power supplies? Is there a preference on which Aruba AP model is used? Do you have a preference on double conversion or line interactive for the UPS's? Is there a specific plug required for the UPS?

Answer:

 Are you tax free and willing to provide a tax free certificate?  Yes

Do you want Aruba Central licensing or just the base license?  Base License only

Is there a specific POE budget for the switches? 740W or greater
Do the switches need redundant power supplies?
No
Is there a preference on which Aruba AP model is used?
635
 Do you have a preference on double conversion or line interactive for the UPS's?
No preference
Is there a specific plug required for the UPS?
Nothing specific

FIREWALL: --What is your bandwidth from your ISP? --What is your anticipated bandwidth over the lifespan of this appliance? --How many staff and students do you have? --What is your anticipated growth in staff and students over the lifespan of this appliance? --How many devices are concurrently connected? What types of devices? Are your students 1:1? --What is your anticipated device growth over the lifespan of this appliance? --What is the current firewall make and model? --What security bundle do you currently have? --Are you planning to deploy an active/passive high availability pair? (A/P HA) --Do you have a disaster recovery (DR) site? If yes, how is the DR site connected to the central office (CO)? --How many VPNs do you have and what type? --What security services do you need on the firewall? ----Content Filtering ----Application Intelligence and Control ----Intrusion Detection and Prevention ----Anti-Spyware ----Gateway Anti-Virus ----Botnet Filter ----Geo-IP Filter ----Advanced Threat Protection --Are you planning to implement DPI-SSL? --How many subscription years for security services bundle? 1YR, 3YR or 5YR SWITCHES: --Are you replacing all existing switches in district with Project B? --Which Aruba Switch Series are you looking for the 20 on Project B and on Project C - 6300 or 6200? --What is needed for the 20 "modules, GBIC transceivers"? Do you need DAC cables Do you need transceivers - is so, what speed and fiber type? WIRELESS ACCESS POINTS: --Are you replacing all existing AP's in district on Project B? --Assume that cabling is in place? --Will a lift be needed for any AP installation? --Do you have any areas that may need a high-density AP? If so, how many?

Answer:

 FIREWALL: --What is your bandwidth from your ISP? -- 10G for HS project 1G for all other campuses

What is your anticipated bandwidth over the lifespan of this appliance? --  Possibly up to 10G

How many staff and students do you have? -- 900 Staff, 7,100 Students

What is your anticipated growth in staff and students over the lifespan of this appliance? -- 7%

How many devices are concurrently connected?  Hardwired, around 2500, with mobile, closer to 10,000

What types of devices?  Desktops, chromebooks, ipads, interactive tvs

Are your students 1:1? -- Secondary (7-12) is 1:1 and Elem/int have classroom sets

What is your anticipated device growth over the lifespan of this appliance? -- 7%

What is the current firewall make and model? -- Fortigate 600E

What security bundle do you currently have? -- Intrusion protection

Are you planning to deploy an active/passive high availability pair? (A/P HA) -- No

Do you have a disaster recovery (DR) site? If yes, how is the DR site connected to the central office (CO)? -- No

How many VPNs do you have and what type? -- No

What security services do you need on the firewall? ----   All listed but no content filtering

Content Filtering ----Application Intelligence and Control ----Intrusion Detection and Prevention ----Anti-Spyware ----Gateway Anti-Virus ----Botnet Filter ----Geo-IP Filter ----Advanced Threat Protection --

Are you planning to implement DPI-SSL? -- No

How many subscription years for security services bundle? 1YR, 3YR or 5YR SWITCHES: - 3 Year

-Are you replacing all existing switches in district with Project B?  No, just some of the older ones

--Which Aruba Switch Series are you looking for the 20 on Project B and on Project C - 6300 or 6200?  6200

--What is needed for the 20 "modules, GBIC transceivers"?  SFP+ 1G Single Mode

Do you need DAC cables No

Do you need transceivers - is so, what speed and fiber type?  Single Mode

WIRELESS ACCESS POINTS: --Are you replacing all existing AP's in district on Project B? --Assume that cabling is in place? Correct, cabling is in place

 --Will a lift be needed for any AP installation? -- Yes

Do you have any areas that may need a high-density AP? If so, how many? No