All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Coldspring-Oakhurst CISD
IFCB Posted : Jan 27, 2023
Bid Deadline : Friday, Mar 3, 2023

Questions Due By : Tuesday, Jan 31, 2023
Applicant Address : Coldspring, TX 77331
IFCB ID : 230017098

IFCB Requirements :

·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B.  Bids for individual components of a single project will be disqualified.

 


Services and Equipment Requested :

NOTE: IF YOU PREVOUSLY SUBMITTD A BID UNDER 470/IFCB # 230006541 YOU MUST SUMBIT A BID UNDER 470/IFCB #230017098. This 470/IFCB includes additional equipment that was not listed under 470/IFCB # 230006541. 

Category Two:

 

INTERNAL CONNECTIONS

Our network consists of various HP/Aruba switches and Ruckus WAPs. We are working towards upgrading most of the infrastructure backbone to keep up with technology needs and to fill in dead spots that WiFi coverage is not getting to. We are looking for a company to come in and supplement, replace, and/or install new up-to-date equipment. We would like to continue using our Ruckus WAPs, but move them to a could controller instead of local controller. We would also like the switches to be viewed on the same cloud controller. Installation will need to include analyzing our current settings and mirroring them to the new devices.

 

Ethernet drops will need to be ran and terminated where needed. Some patch panel space exists, but up to 10 more patch panels may need to be installed with cables punched down. Please include up to 275 x 5 FT CAT 6 patch cables. Switches will need to be configured in a manner that replicates the settings of the current outdated switches in the network when replacing them. WAPs will need to be configured to have compatible settings as the current local controller (SSIDs, Radius, etc.). Installation will also need to include the install of 112 access points that the district currently has that needs to be installed. For the SFPs, most fiber runs are 500m distance, five are under 1000m, and 5 (BiDi SFP) are between 1 and 10 miles apart.

 

 

IC Project A – Cabling

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Antennas, Connectors and Related Components

15

Patch Panels

Cabling

275 qty

Cat 6 Ethernet drops

Cabling

275 qty

5 ft patch cables

 

 

 

IC Project B – Network Equipment

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

35

Stacking cables for switches

Switches

1

Ruckus preferred – ICX7550-24F with 5-year cloud licensing

Switches

10

Ruckus preferred – ICX7150C10ZP with 5-year cloud licensing

Switches

60

Ruckus preferred – ICX7150-48ZP with 5-year cloud licensing

Modules, GBIC, transceivers

70

Ruckus compatible GBIC – 10GB SFP

Modules, GBIC, transceivers

1

Ruckus compatible GBIC - 100GB SFP

Modules, GBIC, transceivers

10

Ruckus compatible GBIC – 10GB BiDi SFP

 

Wireless Access Points

25

Ruckus preferred, exterior AP, T750 or compatible with 5-year cloud licensing

Wireless Access Point Installation

112

Installation/configuration of 112 existing WAPs. The district already owns these 112 WAPs, please only quote installation.

Wireless Access Point Licensing

10

Ruckus R700, 5-year cloud licensing for existing equipment

Wireless Access Point Licensing

38

Ruckus R730, 5-year cloud licensing for existing equipment

Wireless Access Point Licensing

112

Ruckus R650, 5-year cloud licensing for existing equipment

Wireless Controller

1

No preference, Cloud controller – The district prefers that the switches be compatible with and/or on the same cloud controller as the WAPs.

 

NOTE: We are requesting WAP or Controller or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B.  Bids for individual components of a single project will be disqualified.

 

 

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2023_C2_Bidding_Instructions193.docx
COLDSPRING_OAKHURST_V2_C2_COVER_PAGE_.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




• Total # of Buildings • Total Sq.Footage for Each Building • If multiple buildings, how are they connected (i.e. Fiber, P2P, etc.) • Total Classrooms • Total Admin rooms • # of Indoor Gymnasiums • # of Common Areas (i.e. auditoriums, cafeterias, music centers, outdoor coverage, etc…) • Total Users • Total number of Switch Closets • How are the switch closets connected? • Can you share floorplans of your school(s) that identify the location of your switching closet(s) (i.e. MDF & IDF)?

Answer:

Total # of Buildings: There are appx 25-30 bldgs located throughout the district/campuses

Total Sq.Footage for Each Building: These range from 5,000 to 50,000 sq ft.

If multiple buildings, how are they connected (i.e. Fiber, P2P, etc.): Mostly fiber

Total Classrooms : Close to 200 total

Total Admin rooms: Close to 50

# of Indoor Gymnasiums: 4

# of Common Areas (i.e. auditoriums, cafeterias, music centers, outdoor coverage, etc.…) : 15-20

Total Users : 17-1800

Total number of Switch Closets: 35

How are the switch closets connected?: Fiber and Ethernet

Can you share floorplans of your school(s) that identify the location of your switching closet(s) (i.e. MDF & IDF): The bid winner will receive floor plans upon request.