school Alma School District 30
IFCB Posted : Nov 23, 2022
Bid Deadline : Friday, Dec 30, 2022

Questions Due By : Friday, Dec 2, 2022
Applicant Address : Alma, AR 72921
IFCB ID : 230005887

IFCB Requirements :

·        All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·        Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·        Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·        By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·        Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·        Contracts must not prohibit SPIN changes.

 

·        Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·        Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·        All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·        All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·        All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·        If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.

 

·        The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 


Services and Equipment Requested :

CATEGORY TWO

NOTE: This IFCB/470 replaces the previous IFCB 230004338 – that IFCB did not have the request for 150 drops and patch panels or additional equipment needed.

NOTE: Questions and Answers from the previous IFCB 230004338 are available to download on this IFCB.

 

 

INTERNAL CONNECTIONS

The applicant is continuing their district-wide buildout of all new switches and wireless.  This project includes Alma Primary School,  Alma Intermediate School and Alma High School.  Vendors will be required to deliver, install, and configure switches on each of the three campuses; certify existing Yellow Cat5 and new Cat6e; verify ability to push 2.5GB POE to new and existing Aruba WAPs.  Five year licensing is required for Aruba Central Management. Cat 6e drops will be required for new WAP.

 

Type of Equipment

Quantity Vendor Should Bid

Preferred Make/Manufacturer

Antenna, Connectors and Related Components

8

24 port Cat 6e patch panels

Cabling/Fiber Runs

Approx. 300 meters

2 Single mode, 6 strand runs from IDF to MDF, one for Alma Primary and one for Alma Intermediate

Cabling

150

Yellow Cat6e

Switches

15

Aruba POE Smart Rate; include 5 year licensing

Modules, GBIC, transceivers

30

SFP+ 10GB, compatible allowed (non-oem)

UPS/Battery Backup

6

No preference; 110v input, 500VA minimum output, lithium ion, short depth required

Wireless Access Points

150

Aruba 635; include 5 year licensing

 

NOTE: We are requesting switch and WAP licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATABILITY REQUIREMENT

All equipment must be compatible with Aruba Central.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Alma_C2_Cover_Page1.pdf
Questions_and_Answers_from_IFCB_230004338.docx
2023_C2_Bidding_Instructions147.docx

Questions Received with Applicant Answers   ( Ask Questions? )




Hi, MM or SM transceivers ? Are there existing, fully reusable pathways for the fiber runs ? Fiber is indoor only ? What is the average/longest length of the copper cable drops ? Are there any high ceiling installations ? Are additional patch cords required ? Thank you

Answer:

1. SM 10GB capable fiber

2 new fiber pulls in drop ceiling. may require old brick walls to be drilled, and/or firewall penetration

3. indoor only with NO high ceilings to navigate

4. use 50m as average run length

5. patch panel installation and patch cables required. 

How many ports should the switches have ? Thank you

Answer:
24

Is this a replacement or a new installation ? Thank you

Answer:

these fiber runs replace a MM fiber run

Is the only addition to this RFP the 150 Cat6e cables? Those are just for the access points?

Answer:

answer, yes. including the patch panels

Are you considering other vendors other than HP Aruba? The supply issues are concerning.

Answer:

 As long as the equipment is compatible with  Aruba Central, we will accept bids for that equipment.