school Bowring School District 7
IFCB Posted : Nov 9, 2022
Bid Deadline : Thursday, Dec 29, 2022

Questions Due By : Friday, Nov 18, 2022
Applicant Address : BOWRING, OK 74009
IFCB ID : 230004286

IFCB Requirements :

·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, Project B and/or Project C.  Bids for individual components of the project will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project Dand/or Project E.  Bids for individual components of a single project will be disqualified.

 

·         DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.

  


Services and Equipment Requested :

UPDATE 12.1.22 - THE BID DEADLINE HAS BEEN UPDATED TO 12.29.22
UPDATE 11.11.22 - The 1 G copper fiber transceivers for existing copper between the HS and computer room has been updated to the HS and Athletic Building. 
UPDATE 11.10.22 - The 2 x CAT 6 plenum cabling fiber runs has been updated to include an approximate length.

Category Two:

VOLUNTARY SITE VISIT

Vendors wishing to bid on internal connections can attend a voluntary site visit either November 16th, 2022, or November 17th, 2022, both will begin at 9am. Vendors will meet at 87 County Road 3304, Pawhuska, OK 74056. Vendors will check in with Nicole Hinkle.

 

INTERNAL CONNECTIONS

Installation is needed for the entire project. Bids should include all necessary licensing.

 

Project A – Network Equipment

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

100 ft

Approximately 100 ft of MM fiber cabling from the HS to computer room

Cabling

2

CAT 6 plenum cabling fiber runs for APs - approximatley 250 ft total

Switches

6

No preference – 48 port 1G PoE+ switches w stacking, 1G/10G uplink ports

Modules, GBIC, Transceivers

2

1G MM fiber transceivers for existing fiber between the HS and computer room

Modules, GBIC, Transceivers

2

1 G copper fiber transceivers for existing copper between the HS and computer room Athlethic Building

UPS/Battery Backup

2

Liebert 1500 1U rack mount UPS

UPS/Battery Backup

2

Liebert 1500 2U rack mount UPS

Wireless Access Points

9

WiFi6 802.11ax wireless access points with 1 year licensing (7 are being replaced, 2 are being added)

 

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

Project B – Firewall, 1 YR security bundle

The district will purchase either Project B, 1 YR security bundle OR Project C, 3 YR security bundle. Not both.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall

1

No preference - Firewall w 1yr security bundle

 

Project C – Firewall, 3 YR security bundle

The district will purchase either Project B, 1 YR security bundle OR Project C, 3 YR security bundle. Not both.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall

1

No preference - Firewall w 3 yr security bundle

 

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, Project B and/or Project C.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

 

BASIC MAINTENANCE OF INTERNAL CONNECTIONS:

BMIC PROJECT D – Firewall, 1 YR security bundle

The district will purchase either Project D, 1 YR security bundle OR Project E, 3 YR security bundle. Not both.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall

1

Firewall w 1yr security bundle

 

BMIC PROJECT E – Firewall, 3 YR security bundle

The district will purchase either Project D, 1 YR security bundle OR Project E, 3 YR security bundle. Not both.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall

1

Firewall w 3yr security bundle

 

DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project D and/or Project E.  Bids for individual components of a single project will be disqualified.

 

DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2023_C2_Bidding_Instructions123.docx
BOWRING_C2_COVER_PAGE.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Hi, is the fiber indoor or outdoor ? How many strands ? Could you please share the site plan ? Are there existing pathways and are they fully reusable ? Will the cabling replace the existing one or this is a new installation ? The transceivers are for the new switches ? If for existing please specify the model ? Network cards for the UPS ? Thank you

Answer:
: Hi, is the fiber indoor or outdoor ? INDOOR How many strands ? 6  Could you please share the site plan ? NOT AVAILABLE Are there existing pathways and are they fully reusable ? NO  Will the cabling replace the existing one or this is a new installation ? NEW The transceivers are for the new switches ? If for existing please specify the model ? Network cards for the UPS ? YES Thank you