All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Pottsville School District
IFCB Posted : Sep 8, 2022
Bid Deadline : Sunday, Oct 23, 2022

Questions Due By : Friday, Sep 23, 2022
Applicant Address : Pottsville, AR 72858
IFCB ID : 230001007

IFCB Requirements :

·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B.  Bids for individual components of a single project will be disqualified.


Services and Equipment Requested :

 

Category Two:

VOLUNTARY SITE VISIT

Vendors wishing to bid on internal connections can attend a voluntary site visit either September 15, 2022, or September 22, 2022, both will be held at 1pm.  Vendors will meet at Pottsville Jr High School, 250 Apache Drive, Pottsville, AR 72858. Vendors will check in with Richard Morton

 

INTERNAL CONNECTIONS

Project A – Cabling drops

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

50

Data drops

 

Project B -Switches/UPS

Installation and configuration needed. Aruba central licensing needed for the switches.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

4

HP/Aruba 48 Port PoE +

Modules, GBIC, transceivers

6

No Preference – 10 gig fiber

UPS/Battery Backup

2

No Preference - 2200 VA Rackmount

 

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B.  Bids for individual components of a single project will be disqualified.

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2023_C2_Bidding_Instructions13.docx
POTTSVILLE_C2_COVER_PAGE1.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




For Project A, cable drops -- will all 50-drops be in the same building or multiple buildings? If multiple -- how many buildings? Are the buildings in close proximity to one another? Do you have a diagram with MDF, IDF's, and where you would like each cable ran? What are the 50-drops for -- Wireless Access Points in Classrooms? Are any of the drops in area's like a gym or cafeteria where a lift may be required (if so, do you have a lift for vendors to use)? Are the ceilings standard drop ceilings? Will any of the drops be in areas that require molding/covering because the walls are concrete versus sheet rock?

Answer:

The drops are in multiple buildings. I would say the building are in close proximity. I don't have a diagram with the drops labeled. All drops fore Data for computers. No drops are in a gym or cafeteria that needs a lift. Ceilings are standard drop ceilings. I would say they need mold coverings. 

Layer 2, layer 3 lite layer 3 advanced: Single mode or Multimode: How many are you stacking: What are you using it for:

Answer:

Layer 3.

Multimode

I'm noting stacking.

used on edge for computer data access.

Can you tell me the answers to the questions below? Switches: Layer 2, Layer 3 lite, or Layer 3 advanced? Modules, GBIC, transceivers: For transceivers- single mode or multimode? Aruba central licensing needed for the switch: For Aruba Central, 1, 3, 5, 7, or 10 years? If possible, could you provide the Mfg/Part# for the below options needed? Type of Equipment Quantity Vendor Should Bid Preferred Make/Manufacturer Switches 4 HP/Aruba 48 Port PoE + Modules, GBIC, transceivers 6 No Preference – 10 gig fiber Can you confirm if we can quote Recertified UPS APC units for the below? CoastTech is the only Recertified APC UPS company that recalibrates and is Certified to resell these and have extremely discounted units with a 2 Year Warranty. From: RFP Bid Sponsor Bid Type Bid Title Institution State PreBid Due Date Memo K12 ITB Internal Connections | Cabling | Switches| Modules, GBIC, Transceivers| UPS/Battery Backup Pottsville School District

Answer:

Please make sure you are reading all of the submitted questions and answers. Several of your questions have already been answered.

Layer 3

MM transceivers

No Aruba Central

No part numbers available

Recertified OK

Hi, regarding the data drops, do you need Cat6 or Cat6A, or other category ? Plenum rated ? Any color preference ? New patch panels, how many ? new patch cords, length ? Thank you

Answer:

Cat6 for data drops.

Plenum not needed.

No color preference.

Patch Panel not needed.

No patch Cords.