All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Owasso Indep School Dist 11
IFCB Posted : Sep 28, 2022
Bid Deadline : Tuesday, Nov 15, 2022

Questions Due By : Wednesday, Oct 12, 2022
Applicant Address : Owasso, OK 74055
IFCB ID : 230001580

IFCB Requirements :

·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

·         INTERNET ACCESS DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.

 


Services and Equipment Requested :

UPDATE 10/18/22:  The bid deadline has been updated to 11/15/2022. Maps are now available for download along with this IFCB.

UPDATE 10/12/22:  A spreadsheet is now available for download regarding the Category 2 Project.

Category 1

Internet Access - District is specifically requesting bids for 10GB and 15 GB bandwidths, however they will accept bids up to 25 GB. Please include SLA with bid. District prefers a 3-year contract term. The terminating address for this circuit is 12901 E 86th St North, Owasso, OK 74055.

 

E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.

 

NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.

INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

INTERNET ACCESS DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.

 

Category 2

Internal Connections

MANDATORY SITE VISIT

Vendors wishing to submit bids for category two project must attend one of two mandatory site visits. The site visits will be held on October 5th, 2022 and October 11th, 2022. Both will begin at 9:00 am. Vendors will meet at 7th Grade Center, 1400 North Main St, Owasso, OK 74055 and check in with Russell Thornton. Bids from vendors who did not attend either of the site visits will be disqualified.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Antennas, Connectors and Related Components

9

Dell 10GB SM LC GBIC Module

Antennas, Connectors and Related Components

5

Leviton fiber enclosures including required connectors

Antennas, Connectors and Related Components

3

Leviton Cat6 Modular Patch Panel

Cabling

2

Switch Stacking Cables

Cabling

3

Single-mode fiber runs – LC connections

(One 30 strand and two 6 strands)

Cabling

4

Single-mode fiber patch cable – LC connections

Racks

7

Tripp Lite/Hoffman – lockable and glanded. Switches and equipment must fit fully in racks

Switches

3

Dell N2248PX-ON – including licensing and stackable with existing switches in cabinet

UPS

25

Tripp Lite SMART 1500RM2UN – including network interface

Wireless Access Points

255

Extreme/Aerohive

 

COMPATIBILITY REQUIREMENT

GBIC modules must be compatible with existing and new equipment being requested. Switch stacking cables must be compatible with various models of associated Dell switches.   Dell N2248PX-ON switches must be stackable with existing switches in cabinet.  WAPs must be compatible with ExtremeCloud IQ Management.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.

Questions Received with Applicant Answers   ( Ask Questions? )




24 or 48 port Leviton CAT6 Patch Panels?

Answer:
24 port

UPS: --Are all new UPS units to be 1500VA? FIBER CABLING: --Is there any outdoor between network closets that will require trenching/boring or aerial? MAP: --Per site visit, requesting floor plans/maps showing locations of AP's.

Answer:

Yes, all new UPS units must be networkable, 1500VA.

 

FIBER CABLING - There is an existing underground fiber run from the 7GC MDF to the SPED closet that is being replaced. If the vendor chooses to use the existing underground conduit, there will be no need for trenching/boring or aerial.

 

Maps  of the AP locations for the sites receiving upgrades or new AP installs (6GC, 7GC, Ator, Bailey, Barnes) will be posted to the IFCB shortly.