school Callisburg ISD
IFCB Posted : Dec 9, 2020
Bid Deadline : Wednesday, Jan 13, 2021

Questions Due By : Monday, Dec 14, 2020
Applicant Address : Callisburg, TX 76240
IFCB ID : 210007674

IFCB Requirements :

·         All Questions and Bids must be submitted using the on-line IFCB system. If the IFCB system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12-month period.  This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one-year terms. Please include this language in your final contract.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid or your bid will be disqualified. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. If the applicant discovers that fees, taxes or surcharges apply but are not listed on the bid (after the time of bid awards) those charges will be the responsibility of the bidding company.

 

·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS:  Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

 

·         DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

 

·         DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.

 

·         DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.



 


Services and Equipment Requested :

This IFCB/470 is intended to supplement the previous 470/IFCB # 210002320. During the previous bid window for IFCB #210002320 newspaper ads were not placed while the RFP was open. In order to ensure compliance with Texas Procurement rules, we are issuing a new 470 and will be running ads while this 470/IFCB is open. If you previously bid on 210002320 you do not need to place new bids for this current IFCB. If you missed the bid deadline for the first IFCB #210002320 and would like to submit a bid for this new IFCB, please do.

 

CATEGORY TWO

 

INTERNAL CONNECTIONS

Applicant is replacing outdated WAPs and switches on three campuses.  They are also adding cabling in the Elementary School to accommodate new WAP locations.  Applicant will need the switches and modules installed and configured in existing racks.  The UPS devices will need to be installed and configured.  The WAPs will need to be installed and configured including cabling for the new WAP locations. Maps are available to download for the data drops.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

30

Cat 6 network drops

Firewall Service and Components

1

Fortinet or functional equivalent

Switches

5

HPE/Aruba 120 port switches or functional equivalent

Antenna, Connectors and Related Components

30

Fiber SFP modules (for the 5 x 120 port switch request)

Switches

1

HPE/Aruba 264 port switch or functional equivalent

Antenna, Connectors and Related Components

12

Fiber SFP modules (for the 1 x 264 port switch request)

UPS/Battery Back up

15

APC or functional equivalent

Wireless Access Points

120

Aruba or functional equivalent; including licensing

Wireless Controller

1

Aruba or functional equivalent; including licensing if needed

 

Compatibility Requirement

 

All requested equipment should be compatible with applicants existing HPE/Aruba switches and existing Aruba WAPs.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS:  Bids from companies that include equipment barred by the Federal Communications Commission due to national security risks (such as ZTE or Huawei) will be disqualified.

 

BASIC MAINTENANCE OF INTERNAL CONNECTIONS

Applicant is requesting BMIC for some of the equipment requested under Internal Connections.  The applicant is requesting help to maintain updates, bug fixes and technical support for the firewall, switches, WAPs, and controller.   Applicant is requesting a manufacturer’s support contract for Project A.  Applicant would also like pricing for a four hour block of hours for Project B.

 

PROJECT A – Manufacturer’s Support

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall Service and Components

1

Fortinet or functional equivalent

Switches

5

HPE/Aruba 120 port switches or functional equivalent

Antenna, Connectors and Related Components

30

Fiber SFP modules (for the 5 x 120 port switch request)

Switches

1

HPE/Aruba 264 port switch or functional equivalent

Antenna, Connectors and Related Components

12

Fiber SFP modules (for the 1 x 264 port switch request)

Wireless Access Points

120

Aruba or functional equivalent; including licensing

Wireless Controller

1

Aruba or functional equivalent; including licensing if needed

 

PROJECT B – Four Hour Block of Time Support

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall Service and Components

1

Fortinet or functional equivalent

Switches

5

HPE/Aruba 120 port switches or functional equivalent

Antenna, Connectors and Related Components

30

Fiber SFP modules (for the 5 x 120 port switch request)

Switches

1

HPE/Aruba 264 port switch or functional equivalent

Antenna, Connectors and Related Components

12

Fiber SFP modules (for the 1 x 264 port switch request)

Wireless Access Points

120

Aruba or functional equivalent; including licensing

Wireless Controller

1

Aruba or functional equivalent; including licensing if needed

 

DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.

DISQUALIFICATION FACTOR BMIC PROJECT A AND PROJECT B: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Callisburg_C2_COVER_PAGE1.pdf
2021_C2_Bidding_Instructions150.pdf
Radware_data_drops1.pdf
Woodbine_data_drops1.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




IFCB ID : 210007674 what firewall model number does the customer want and what term ? What are the Aruba Switch and Model numbers ? On the Fiber SFP modules does he want short range or long range ? Multi Mode or Single Mode ?

Answer:

1) Fortigate-600E preferred with 5 year term

2) Aruba 5406 JL003A - (5)  configured with 116 Ports PoE+ and 4 SFP+ Ports

    Aruba 5412 JL001A - (1) configured with 236 Ports PoE+ and 4 SFP+ Ports

3) short range multi mode specifically Aruba 10G SFP+SR - J9150E - (32 total - 4 in each 5406 chassis and 12 - the 5412 chassis) 

For the 15 UPSs: 1. Is there a specific UPS model being requested? 2. Rackmount or Tower? 3. Is there a specific VA or wattage capacity required? 4. What will connect to the UPS? 5. If switches will be connected, how many PoE devices will be connected to the switches?

Answer:

1) SMX2000RNLV2UNC 

APC Smart-UPS x 2000 Rack mount 1800 WATT - 1920 VA with APC UPS network Management Card AP9631

 

2) rack mount

3) 1920 VA 1800 WATT

4) switch will connect to UPS

5) The switch with the most total allocated power has 354W allocated. Given that existing AP's are PoE+ (some @ 30W) I think the new needed wattage capacity would be comparable