All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, Connectors and Related Components |
Anderson Elementary |
10 |
Legrand 48-port blank keystone patch panel or functional equivalent |
Cabling |
Anderson Elementary |
4 |
Network drops |
Cabling |
Anderson Elementary |
50 |
Fiber runs |
Switches |
Anderson Elementary |
6 |
Aruba 48-port POE 1Gbe with 1G/10G fiber SFP modules or functional equivalent |
Wireless Access Points |
Anderson Elementary |
20 |
Ruckus R610 or functional equivalent |
Wireless Controller |
Anderson Elementary |
1 |
Ruckus cloud controller or functional equivalent |
2020C2BiddingInstructions31.pdf |
AndersonC2COVERPAGE37.pdf |
Answer:
5 new drops, and the other cabling is already ran, just needs to be terminated. All was clearly shown on the walk through. I pointed out the unterminated cables and they took photos. The new access points already have cable ran. No additional cabling is needed there. So a total of 5 new drops. Everything else just needs to be terminated or installed. Approximately 50 fiber runs need to be terminated.