All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
Ashdown High
|
55
|
Cat6E drops for wireless access points
|
Switches
|
Ashdown High
|
2
|
Aruba 2920 48-port or functional equivalent
|
Wireless Access Points
|
Ashdown High
|
55
|
Aruba 315/305 or functional equivalent.
|
Wireless Controller
|
Ashdown High
|
1
|
Cloud Based
|
Cabling
|
Ashdown Junior High
|
45
|
Cat6E drops for wireless access points
|
Switches
|
Ashdown Junior High
|
1
|
Aruba 2920 48-port or functional equivalent
|
Wireless Access Points
|
Ashdown Junior High
|
45
|
Aruba 315/305 or functional equivalent.
|
Wireless Controller
|
Ashdown Junior High
|
1
|
Cloud Based
|
Cabling
|
Henderson Intermediate
|
35
|
Cat6E drops for wireless access points
|
Switches
|
Henderson Intermediate
|
1
|
Aruba 2920 48-port or functional equivalent
|
Wireless Access Points
|
Henderson Intermediate
|
35
|
Aruba 315/305 or functional equivalent.
|
Wireless Controller
|
Henderson Intermediate
|
1
|
Cloud Based
|
Switches
|
Elementary
|
2
|
Aruba 2920 48-port or functional equivalent
|
Wireless Access Points
|
Elementary
|
65
|
Aruba 315/305 or functional equivalent.
|
Wireless Controller
|
Elementary
|
1
|
Cloud Based
|
2019C2BiddingInstructions9670.docx |
C2COVERPAGE9.pdf |
Answer:
the PoE+
Answer:
Are the switches requested just for powering the ap's? Basically for extra connections due to the added ap’s.
Will all ap's cabling go back to one closet or are there other PoE switches in the network? They will be spread out across the campus. Too much distance to run from one closet.
Is the cabling already in place in the Elementary? Yes we cabled this building during a remodel this past summer.
Answer:
1 gb uplinks are fine for now. We would want the ability to upgrade to 10gb down the road.
Answer:
3 years