UPDATE: 11/9/18 10:34AM-Floor plans have been added.
UPDATE 10/23/18 - 470 AND IFCB # HAVE BEEN UPDATED TO 190003102.
Internet Access – Applicant currently has 500 bandwidth and will consider bids up to 10GB. Applicant is specifically requesting bids for 1GB bandwidth. The terminating address for this circuit is 206 SW 2nd, Tuttle, 73089.
E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.
NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.
NOTE: Per USAC’s current guidance about applying for Internet access this applicant is checking the Leased Lit Fiber, Internet Access: ISP Service only and Internet Access and Transport Bundled.
DISQUALIFICATION FACTOR INTERNET: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).
INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
Category 1 Network Equipment – 2 SFP needed for either end of fiber from ECC to Intermediate. Please provide bids 2 LXSFP and 2 LRSFP+. The district will only need 2 depending on bandwidth selected.
Self-Provisioned Fiber Connection – From Early Childhood Center at 400 E Oak, Tuttle 73089 to Intermediate School at 402 E. Oak, Tuttle 73089. If possible, please include all construction costs, installation, 10 Gig Optics and miscellaneous charges for your turn key project and must be lit within the same funding year (if you are quoting the fiber solution, please make sure that all costs are identified on your bid). If there are vendors that just provide quotes for the optics/equipment, we will accept those standalone quotes.
MANDATORY SITE VISIT
Vendors wishing to submit bids for Self-Provisioned Fiber must attend one of two mandatory site visits. The site visits will be held on November 1, 2018 and November 8, 2018. Both will be at 10:00am. Vendors will need to report to 515 E. Main, Tuttle 73089. Bids for Self-Provisioned Fiber from vendors who did not attend either of the site visits will be disqualified.
Winning bidder will need to provide the following:
The route mapped in either a .kmz or .json file.
Aerial portion of fiber build:
1. What is the average cost of the fiber material per foot? (E.g. cost of actual fiber cables.)
2. What is the average cost of the Fiber placement per foot?
3. What is the average cost of the structure material per foot? (e.g. cost of conduit, splicing, make ready pole attachment, etc.)
4. What is the average cost of the structure placement per foot?
Buried with Conduit (underground)
1. What is the average cost of the fiber material per foot? (E.g. cost of actual fiber cables.)
2. What is the average cost of the Fiber placement per foot?
3. What is the average cost of the structure material per foot? (e.g. cost of conduit, splicing, make ready pole attachment, etc.)
4. What is the average cost of the structure placement per foot?
Leased Wide Area Network Circuit – 1 x 1 to 10 GB connection any delivery type. Dark fiber bidders should bid 6 strands of fiber. Lit leased fiber bidders should bid 1 - 10 Gbps.
DISQUALIFICATION FACTOR WAN: Bidders who are not eligible to provide OUSF support will be disqualified
. By placing a bid for these services the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).