All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
Elementary
|
2
|
Aerohive SR2348 L3 48-port PPOE+ or functional equivalent
|
Wireless Access Points
|
Elementary
|
6
|
AP370 or AP250 including Aerohive w/Hive Manager Online Express for 370 and/or 250 series AP for 3 years, includes 8x5 phone support, software subscription, and customer portal access or functional equivalent
|
Cabling
|
Elementary
|
1000’
|
Cat6E Cable for WAPs cable color green
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
ECC
|
2
|
Aerohive 16 or 24-port PPOE+ or functional equivalent
|
Wireless Access Points
|
ECC
|
3
|
AP370 or AP250 including Aerohive w/Hive Manager Online Express for 370 and/or 250 series AP for 3 years, includes 8x5 phone support, software subscription, and customer portal access or functional equivalent
|
Firewall Service and Components
|
ECC
|
1
|
SonicWall TZ400 w/software subscription/support or functional equivalent
|
Firewall Service and Components
|
ECC
|
1
|
SonicWall Management License for VPN 10 pack or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Make/Manufacturer
|
Wireless Access Points
|
Richards District
|
22
|
License renewals for existing AP250 devices: Aerohive AH-ERATE-HMOL-3YR-250-FCC
|
2019C2BiddingInstructions9060.docx |
C2COVERPAGE6288.pdf |
Answer:
The cabling requested is for the AP's that would be installed for at the Main School Building. Separate cabling would be needed for the AP's in the Early Childhood Center (ECC) as part of installation.
Answer:
First question: The cabling requested is for the AP's that would be installed for at the Main School Building. Separate cabling would be needed for the AP's in the Early Childhood Center (ECC) as part of installation.
Second question: Connections to the switches in the Main School Building will be fiber. Copper connections would be used at the Early Childhood Center. We need SPF+ modules.
Answer:
Project I: One 48 port switch will be added to each of the two main network closets. We will want the SFP+ to uplink to each other in each of the separate closets to the existing equipment. You will need a fiber patch cable.
Project II: The 24 port switch will go in a new location - the Early Childhood Center. There is not fiber/WAN currently in place at this location. It will most likely not be 10gb speed.