school Greenville ISD
IFCB Posted : Dec 14, 2017
Bid Deadline : Wednesday, Jan 24, 2018

Questions Due By : Friday, Dec 22, 2017
Applicant Address : Greenville, TX 75401
IFCB ID : 180009283

IFCB Requirements :
·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
 
·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
 
·         Please include the correct Service Provider Identification Number (SPIN) on your bid.
 
·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
 
·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.
 
·         Contracts must not prohibit SPIN changes.
 
·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
 
·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period.
 
·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.
 
·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.
 
·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
 
·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified. 

Services and Equipment Requested :

UPDATE: 1/11/2018 2:10PM- The bid deadline has been extended until 1/24/2018.

INTERNAL CONNECTIONS

 

INTERNAL CONNECTIONS:  There is another document associated with this IFCB available for download that details the equipment the applicant wishes to purchase.  The document lists equipment that the applicant prefers – they will also accept functional equivalents of said items. 

 

 

PROJECT NARRATIVE

 

We are looking to upgrade our wireless for all of our campuses and have access points installed in each room.  The cables will run from multiple MDFs and IDFs to the room locations.  Purchase, installation, and configuration of Cisco access points, labeling and inventory, as well as running the cable for the install and testing.  We will configure and mount the switches where needed. 

 

 

VOLUNTARY SITE VISIT

 

Vendors wishing to bid on internal connections can attend a voluntary site visit one day January 4th or January 5th beginning at 8:30am. Vendors will meet at 4004 Moulton St. Greenville, TX 75402.

 

COMPATIBILITY REQUIREMENT

 

Must be compatible with Cisco 5520 Wireless Controller.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

Questions Received with Applicant Answers   ( Ask Questions? )




Hello, will you please answer the following questions for Greenville ISD's 470# 180009283? 1. The district is requesting to purchase access points and have them configured and installed. The "specific quantity" of APs will be the quantity used for bill of materials and services quotes. There is a column with "possibility range of quantity." We do not see where the AP or AP drops will be located on the maps provided. Can that detail be provided or does GISD require WLAN site surveys done for AP location/placements? If so at what campus sites. 2. The bid request mentioned under project narrative that "they will configure and mount the switches where needed." Does GISD require services on only access points/wireless or will the district also want pricing for services to include LAN switching as well? 3. Please confirm that the district intends to re-use existing Cisco WLAN controllers. 4. Does the district want patch cables? If so, what length and will they require one for each end? 5. Given the range of possible quantities specified in the bid, should prospective bidders provide quotes on the min and max quantities or will there be a precise QTY determined for them to bid on? Thank you!

Answer:
 1.      The district currently does not have maps with exact AP placement, however the district is planning on putting an AP in each classroom and 2 in most common areas.

2.      The district will configure and mount the switches. We do not need services on the switches, we just need the quote to include the cost of the switching hardware.

3.      The district is going to use our existing wireless controllers.

4.      We do require patch cables. On the patch panel to switch side we will want the 8 inch 6a Panduit (or equivalent), and on the AP to biscuit end we will want a 6 foot 6a cable for each run.

5.      Bid on the specific quantity listed, and not the ranges.