All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Amount Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
High School
|
5
|
Cat6 Network Drops- Plenum cable, keystone, wall plate, wiremold (as needed), Cat6 patch cables, (rack and workstation), patching into patch panel, necessary patch panels, ceiling hooks, labor, and cable testing
|
Switches
|
High School
|
1
|
24-port layer 2/3 PoE switch
|
Wireless Access Points
|
High School
|
31
|
Unifi UAC-HD-AC or functional equivalent
|
Type of Equipment
|
School Name
|
Amount Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
Elementary School
|
10
|
Cat6 Network Drops- Plenum cable, keystone, wall plate, wiremold (as needed), Cat6 patch cables, (rack and workstation), patching into patch panel, necessary patch panels, ceiling hooks, labor, and cable testing
|
Wireless Access Points
|
Elementary School
|
40
|
Unifi UAC-HD-AC or functional equivalent
|
2019C2BiddingInstructions8.docx |
C2COVERPAGE91.pdf |
Answer:
HS - 5 additional APs, cabling needed
HS - 26 replacement APs
ES - 10 additional APs, cabling needed
ES - 30 replacement APs
Answer:
You may ignore the MIBS request and just bid the BMIC (or vice versa) – you do not have to bid both.