All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
UPDATE: 12/5/17 1:04PM- The bid deadline has been extended to 12/28/17.
UPDATE 11/16/17 - The 11/17 voluntary site visit has been cancelled. The C2 portion of this IFCB has also been cancelled. A new 470 and IFCB will be posted for C2.
Answer:
That is correct, in order to submit a category two bid your bid must be responsive to all C2 requests and include all requested C2 items, including wireless access points.
Answer:
When an applicant specifies a preferred make or model, E-rate rules require us to list and accept bids for “functional equivalents.” E-rate rules also allow applicants to require bids that are compatible with a particular brand. In this case, we will accept bids that are compatible with our Cisco 5520 Wireless Controller. Bids that are not compatible will be disqualified.
Answer:
For all WAN bids (lit and dark) a 3 year term with (5) 1 year voluntary renewals (up to 8 years total).
Answer:
Question: For the cabling requested: CAT6 Plenum or Riser?
We need to use CAT6a Plenum
Is cable support already existing?
Due to the age of the school, I would work up the quote assuming cable support will be needed, because that may be the case in some areas.
Is there any raceway needed for the cable runs, if so would you provide an approximate footage?
There should not be a need for raceway on this project.
Is there any fiber connections being requested within the 640 Cable Drops?
There are not any fiber connections needed.
If fiber connections are required are they all internal to buildings and what is their approximate footage. It there are fiber runs between buildings, is the conduit already in place?
There are not any fiber connections needed.
For the patch panels required, is there a brand preference?
Panduit (or functional equivalent)
Are all the cable runs for the new AP's?
Yes all cable runs are for new APs.
AP's: Is additional licensing required for the Cisco controller to support the new AP's?
Yes we will need licensing for another 450 APs – one year term.
Answer:
We have had to cancel all requests for Category Two on this IFCB/470. We will be issuing a new 470 and a new IFCB for the Category Two items soon. We apologize for any inconvenience.
Answer:
We have had to cancel all requests for Category Two on this IFCB/470. We will be issuing a new 470 and a new IFCB for the Category Two items soon. We apologize for any inconvenience.