All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Prairie Grove School Dist 23
IFCB Posted : Dec 6, 2017
Bid Deadline : Wednesday, Jan 10, 2018

Questions Due By : Thursday, Dec 21, 2017
Applicant Address : Prairie Grove, AR 72753
IFCB ID : 180007622

IFCB Requirements :
·         All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
 
·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
 
·         Please include the correct Service Provider Identification Number (SPIN) on your bid.
 
·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
 
·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.
 
·         Contracts must not prohibit SPIN changes.
 
·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
 
·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period.
 
·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.
 
·         All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.
 
·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
 
·         The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified. 

Services and Equipment Requested :
UPDATE:12/28/17 2:39PM- The bid deadline has been extended until 1/10/18.

UPDATE 12/21/2017: Floor plans and Walkthrough questions have been posted as an attachment.

INTERNAL CONNECTIONS
 
INTERNAL CONNECTIONS PROJECT NARRATIVE:  There is another document associated with this IFCB available for download that lists the project narrative for each site. 
Installation including testing, labeling, terminating of fiber as well as installation of fiber trays. No need for installation or configuration of the SFPs or Fiber Modules. Mounting switch rack on cinderblock wall along with installation of patch panels, network cabling, fiber tray, etc. Install wall-mount switch rack, patch panels, and network cabling.
 
 VOLUNTARY SITE VISIT
Vendors wishing to bid on internal connections can attend a voluntary site visit one day December 14th, or December 21st beginning at 9am. Vendors will meet at 300 Ed Staggs Drive, Prairie Grove, AR 72753.
 
 
PROJECT A
Type of Equipment
School Name
Specific Quantity
 
Preferred Make/Manufacturer
Antennas, Connectors and Related Components
High School
 
2
Cisco C3KX-NM-10G switch module or functional equivalent
Antennas, Connectors and Related Components
High School
 
2
SFP-10G-LR for Cisco 3500 series switch or functional equivalent
Antennas, Connectors and Related Components
Middle School
1
Cisco C3KX-NM-10G fiber module for Cisco 3560-X switch or functional equivalent
Antennas, Connectors and Related Components
Middle School
2
Cisco SFP-10G-LR SFPs, or functional equivalent
Antennas, Connectors and Related Components
Elementary School
1
Cisco C3KX-NM-10G fiber module for Cisco 3560-X switch or functional equivalent
Antennas, Connectors and Related Components
Elementary School
2
Cisco SFP-10G-LR SFPs, or functional equivalent
 
 
PROJECT B
Type of Equipment
School Name
Specific Quantity
 
Preferred Make/Manufacturer
Firewall Service and Components
District Shared
1
Smoothwall S14 firewall appliance with support or functional equivalent
 
 
PROJECT C
Type of Equipment
School Name
Specific Quantity
 
Possible Range of Quantities
Preferred Make/Manufacturer
Cabling         
 
 
 
High School
3
 
Multi-mode, indoor fiber, 12-strand.  Each run length will be approx. 100-200 meters.  Non-plenum cabling FODRX12Y or better. Will need to provide (3) Panduit fiber trays (FMT1), test, label, and terminate all fiber, or functional equivalent.
Cabling         
 
 
 
Middle School
18
18-25
(18) Cat6 network drops, indoor, non-plenum, blue in color. Six of these drops will be for wireless access points. Twelve of the drops will be pulled in the wall, or in surface-mount conduit, in pairs into six classrooms. Network runs will be under 100-meters.  Will need to provide (1) 48-port patch panel and (1) 24-port patch panel.
Racks
Middle School
1
 
Install (1) 12U to 18U wall-mount switch cabinet.  Replace existing patch panel with (2) 48-port patch panels, (1) 24-port patch panel.  Terminate, test, and label existing network drops that will be terminated onto the patch panels. Move switches, fiber tray, and other necessary equipment into the new cabinet.
Cabling         
 
Elementary School
88
88-100
(88) Cat6 network drops. Indoor, non-plenum cabling, blue in color. Of these drops, (18) will be pulled into classroom ceilings for access points. (30) Drops will be to replace old network cabling in a desktop computer lab. (40) Drops will be pulled into classrooms.
Racks
Elementary School
1
 
Install (1) 18U wall-mount switch cabinet. Install (2) 48-port patch panels, (1) 24-port patch panel. Terminate, test, and label new network drops that will be terminated onto the patch panels.
 
 
COMPATIBILITY REQUIREMENT

All SFPs and fiber modules must be compatible with Cisco switches. Switch models include 2900 and 3500 series Cisco switches. Fiber modules and fiber SFPs must be Cisco compatible to work with existing PGSD switches.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that was manufactured for use outside of the United States will be disqualified 

Questions Received with Applicant Answers   ( Ask Questions? )




This project will also include moving existing cabling, including fiber, from the old rack into the new cabinet. Two new 48-port patch panels are required. A Panduit fiber tray (FMT1) or equivalent may be required. How many migrations? Any preferred jack color for the migrated drops (unloaded patch panel)

Answer:
 How many migrations?

Between 150 and 200 existing drops.

 

Any preferred jack color?

Orange