All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
UPDATE 12/14/17 1:16PM- The bid deadline has been extended until 1/5/18.
UPDATE 12/7/17: Infomration provided at walkthrough has been added as an attachment.
UPDATE: 11/28/17 3:21PM-The mandatory site visit being hosted on 12/6/17 has been pushed back one hour to 11:00AM.
UPDATE 11/17/17: Some of the wireless access points were previously incorrectly listed as going to the Elementary. We have corrected that mistake and they are now listed for the Middle School and the requests on the IFCB are now accurate.
Type of Equipment
|
School Name
|
Specific Quantity
|
Preferred Make/Manufacturer
|
Cabling
|
Elementary
|
19
|
|
Wireless Access Points
|
Elementary
|
11
|
Alcatel Omni AP305 2x2:2 dual OAWAP 305 or functional equivalent
|
Wireless Access Points
|
Elementary
|
6
|
Alcatel High Density Omni AP325 4x:4 dual OAWAP325 or functional equivalent
|
Wireless Controller
|
Elementary
|
1
|
Alcatel 4450 Omni wireless OAW-4450 or functional equivalent
|
Type of Equipment
|
School Name
|
Specific Quantity
|
Preferred Make/Manufacturer
|
Cabling
|
Middle School
|
21
|
|
Wireless Access Points
|
Middle School
|
19
|
Alcatel Omni AP305 2x2:2 dual OAWAP 305 or functional equivalent
|
2018C2BiddingInstructions753549.docx |
CaneyValleyC2COVERPAGE35.pdf |
CaneyValleyWalkthroughInfo.pdf |
Answer:
November of 2018 is what we are shooting for but that depends on when the E-rate funding letter is received.
Answer:
Both installation and config.
Answer:
We decline to answer this question at this time.
Answer:
there is no controller at MS this is correct
Answer:
1. Does Cable brand matter?
No preference.
2. What color cable?
Yellow, as that fits with the new cabling that was installed recently.
3. Cat 5e or 6?
Cat6
4. Riser or Plenum?
Plenum will suffice
5. Supports in ceiling existing?
No current supports in the ceiling.
6. Would you like Cable supports for new cables in ceiling quoted?
No, do not quote supports in the ceiling.
7. How would you like user end terminated, keystone or 45?
Keystone
8. How would you like rack side, Punch panel or 45?
Punch panel. Open spaces in existing punch panels exists, there is no need to quote additional panels.
Answer:
Total drops 31
Answer:
The wireless infrastructure is all Alcatel.
We are NOT replacing all existing AP's
All AP's will be indoors
Answer:
I’m sorry but we were unable to extend the deadline.