All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
CategoryTwoInternalConnections16.32.xlsm |
BulkSubmissionInstructions68.pdf |
InstructionsforC2Bids90.pdf |
Answer:
We are replacing all of the current access points (50) with new access points. We are adding 20 additional access points to our 50 current access points.
Answer:
Please bid the switch. We will be filing a new 470 that correctly indicates the need for the switch and not router. Bids should still go through this IFCB.
Answer:
Dell Powerconnect.
Answer:
Yes, All school are connected to the District Fiber Backbone.
Answer:
We do not have a particular model in mind.
Answer:
No, plenum cable is not required.
Answer:
Yes, we will allow vendors to come out on site tomorrow, 4/28 at 4 pm. Go to the Admin Building.
Answer:
No additional walkthroughs will be scheduled.
Answer:
Are new cable pulls required for the new WAP installation?
Yes, 20 pulls
If so, what type of cable? Cat5e, Cat6
5e
Will the vendor need to provide patch panels/cables for the new WAPs?
No
Answer:
I answered the high reach, in the previous email - easy answer is no lift is required.
Answer:
Walkthrough
All access points and attics are reachable via either attic ladder or step ladder.
4 buildings are glazed tile walls
1 is brick
2 are sheetrock
All 20 additional APs are to be installed in buildings with a common attic with cable ways already in place. New runs will be needed for the installation of the 20 APs.
The New High school will have the cabling installed by our construction contractor. These will all be new installations, only requiring to be attached and plugged in.
Placement of APs are in every other classroom, walls allow for signal penetration.
APs will not be installed in hallways as we have 2 hour fire corridors. Except for the new HS, cable drops are being installed as part of construction.
The new HS receives the new switch - rack will be provided.