All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Prices must be held firm for the duration of the associated E-rate Funding Year(s) or until all work associated with the project is complete (including any contract and USAC approved extensions).
ClintonISD201617ErateCat2EquipmentList.pdf |
BasicMaintenanceTemplateV15122.xlsm |
InternalConnectionsTemplateV1511851.xlsm |
InstructionsforC2Bids45.pdf |
Answer:
It replaces it. We have cancelled all C2 requests for bids listed on IFCB 160007156. If you are interested in bidding the C2 requests for Clinton ISD 99, please make sure you submit them on this IFCB (#160012590).
Answer:
Clinton High School
5 runs 2 pair each. So 5 runs with 2 pair left on each of them means that these lengths will be doubled as there will be 2 pair ran with each.
Band to Library - 700 ft.
Science to Library - 350 ft
TornadoTV to Library - 450 ft
Basement to Library - 250 ft.
Ag to Library - 250 ft
4,000 ft. combined total length. with 2 pairs ran to each for redundancy or failure.
Multi-Mode Fiber
LC Connectors
Hiring out to run. Splicing will be involved.
Southwest Elementary
5 runs 2 pair each. So 5 runs with 2 pair left on each of them means that these lengths will be doubled as there will be 2 pair ran with each.
Tech office to Makerspace/Library - 100 feet.
Basement to Makerspace/Library - 325 feet.
2nd Grade Workroom Gym side to Makerspace/Library - 500 feet
4th Grade to Makerspace/Library - 700 feet
3rd Grade to Makerspace/Library - 1000 feet
5,250 ft. combined total length. with 2 pairs ran to each for redundancy or failure.
Answer:
No, they do not.