All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
1.) Do all switches have to be P.O.E? Yes
2.) How many students? About 30 per Class room, 400 to 500 District wide.
3.) Will vendor be responsible for setting up network Vlans? No
4.) Will vendor be responsible for getting rid of all the old cabling? We will like a quote for removing and disposing of the old cabling. Please make sure that you quote this as a separate line item on your quote and your template described as “Cabling Removal” (in case all vendors do not quote this service we need to be able to compare “apples to apples” for the bid evaluations).
5.) Will every drop on the switch be hot? Yes
6.) Do I want the drops covered? The building without ceiling access don’t have to be covered. But when drops enter the class rooms they should be covered.
7.) Battery Back-up runtimes? 7 to 15 mins must be rack mountable with display and network port.
8.) Do all of the switches have to be able to do 10g ? Yes
9.) How many strands do the fiber runs need to have? 6 Strands
10.) What type of ends on fiber? LC
HermitageC2List.xls |
HermitageFloorPlans.pdf |
InternalConnectionsTemplateV1519393.xlsm |
BasicMaintenanceTemplateV15111.xlsm |
Answer:
You can bid any of the projects A- G that you want, but you have to bid everything requested in that individual project otherwise your bid would be disqualified. In your example, you could bid just project A and E and your bids would be considered – as long as those bids included all items for project A and E.
Answer:
We don't have a wireless system in place at all...We have several unmanaged access points in random classes. At this time we are not interested in the webinar
Answer:
I am not sure of this question as I just started this year and everyone is gone for the holidays they wont return until the 4th of Jan. But I think we have two cell phones one for the superintendent and one for the Maintenance director. The superintendent has a IPhone 4s and the Maintenance director has a Samsung flip phone (I think). I think my superintendent has a data plan and the maintenance is just voice and text. I suggest you quote a few different plans to allow us to pick and choose the plan that best fits our needs. If you need additional clarification on this question after the 4th please submit another question with any follow up information you may need. If you are bidding data plans, make sure that you clearly identify the price for data plans as those are no longer E-rate eligible.
Answer:
Atleast 10 minutes for the battery back up. Each enclosure will include a battery backup for the switches/chassis. The battery back up should be able to be networked. The power strips will be plugged into the backup.
Answer:
The two lines are smart phones. They share 10g of data and unlimited talk and text.
Answer:
It isn't a request for 167 switches. The switch counts are listed on the attachments. The switches should be able to do 10G and be p.o.e. The wireless should be ac standard. The file is not corrupt, I was just able to download it. Bids for functionally equivalent equipment will be accepted.
Answer:
Installation is requested and we do want vendors to bid those services.