All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
TuttleC2List.xlsx |
InternalConnectionsTemplateV15123.xlsm |
BasicMaintenanceTemplateV15186.xlsm |
AgBldgplans.pdf |
HSplans.pdf |
Answer:
We have provided drawings/plans of the facility to be constructed, but the facility is not constructed at this time.
Answer:
1) We are open to other solutions and are requesting new bids.
2) We can provide students/staff members with vouchers as guest, but no we are not currently planning a 1:1 environment.
3) At this point no.
Answer:
I’m not certain what the brand of the end points in the other buildings may be, but we are open to other brands.
Answer:
1) Max distance is 315 Feet
2) From main wiring closet to ag building is approximately 340 Feet
3) How many data ports are needed in the main wiring closet? Approx 462
4) How many data ports are needed in the secondary closet? Approx 50
5) Do we want POE+ switches. - yes
Answer:
This is new building construction so we don't have the level of detail we would like to have. Please review our responses to other questions on this IFCB about distances from IDFs and MDFs.
Answer:
There will be a Main and Secondary Server Closet. The maximum cable run distance from the Main Server Closet will be 315 feet both horizontal and vertical. The Secondary server closet will have a maximum distance for cable runs of 130 feet both horizontal and vertical.
The distance of the fiber run from the high school to the Ag Building is approximately 340 feet. I am unsure about the type of fiber jumper.
Answer:
This will be a new facility with an IT infrastructure built from the ground up. The compatibility of the handoff will be pending the other equipment provided by the vendor responsible for running fiber, cabling, wireless access points. If you are just bidding the circuit, you may include leased equipment that meets the TN test.
Answer:
The intermediate campus is connected to the middle school campus
Answer:
The connection will need to be provided by the vendor. The distance will be 340 Feet.
Answer:
The intermediate school will remain connected to the middle school.
Answer:
Cabling: As recommended by the provider
Cabling: Conduit: The building contractor is not responsible to provide conduit
Switches: Yes, for future growth
Switches: Yes, we anticipate two wiring racks in the main closet and one in the secondary closet
Switches: Stacking of switches – We would like the capability, but will defer to vendor recommendations
Wireless: As recommended