All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Year18RequiredICTemplate37.xlsm |
Year18RequiredTemplateInstructions77.pdf |
OttawaUSD290Cat2Projects.xlsx |
OttawaNetworkDiagrams.docx |
Answer:
No
Answer:
All switches need 10Gb capability.
Answer:
We want a 10Gb backbone to each school..so yes, any fiber SFP needs to be 10Gb capable. Links inside the building need to be 10Gb capable. If they are currently RJ45, the switches need to have the ability to go to 10Gb, but we will pull the fiber at a later date (and purchase the proper SFP's later as well). RJ45 SFP's should be 1Gb.
Answer:
A network diagram has been added as an attachment.
Answer:
Line 18 LCN LCN-MDF1 shows 3 Fiber SFPs but where do they connect to? One to 19, one to 51, and one to 23 (currently inactive)
Lincoln data was merged improperly during data collection.
LCN |
LCN-IDFA1 |
WS-C3560-48PS-S |
2 RJ45 GBICs (to 16&17 @1'), Fiber SFP (to 19@170') |
LCN |
LCN-IDFA2 |
WS-C2950G-48-EI |
RJ45 GBIC (to 15@1') |
LCN |
LCN-IDFA3 |
WS-C2950G-24-EI |
RJ45 GBIC (to 15@1') |
LCN |
LCN-MDF1 |
WS-C3560-48PS-S |
3 Fiber SFPs ( to 50@31,500', to 19@4', one disabled to 23) |
LCN |
LCN-MDF2 |
WS-C3560-48PS-S |
2 RJ45 (to 20@1', to 21@1'), 2 Fiber SFP (to 18@4', to 15@170') |
LCN |
LCN-MDF3 |
WS-C2960-48TC-L |
2 RJ45 SFPs (to 19@1', to 22@1') |
LCN |
LCN-MDF7 |
WS-C2950G-48-EI |
RJ45 GBIC (to 19@1') |
LCN |
Lin-Sw8 |
WS-C3560-48PS-S |
RJ45 SFP (to 20@1') |
Line 23 MIS BUSBarn-Sw1 shows 2 Fiber SFPs to 50 but do you really want 2 connections to 50 or does one go somewhere else? One to 50, one to 18. The one to 18 is no longer used.
Line 27 OHS HS-CORE-SW1 shows 5 fiber GBICS with 2 to 51 and how many to 34? (3?) Two to 51, one to 34, one to 33, one to 34. Footages are on those lines.
It also shows 5 RJ45 GBICS to 28? Do you want all 5 connecting to 28 or should some go elsewhere? One to 28, one to 29, one to 30, one to 31, one to 26, footages are on those lines.
Line 32 OHS HS-VOTEC-SW1 showsRJ45 SFP to 35 at 320\' and a Fiber SFP to 33 at 180\'. Was the 320\' to 35 suppose to be a fiber SFP? No. It is RJ45. Cutting it close, but within spec and working. It needs to be fiber...but that is outside the scope of this project.
Line 39 OMS MS-Admin-Office 2 RJ45 SFPs......where do they connect to? Voice Gateway and an ATA
Answer:
All of the switches that have 1Gb RJ45 SFP's currently only have Gb uplink ports. If your new switch is a Gb switch, then no, we would not need SFP's on those switches.
Answer:
1Gb capable.
Answer:
That USAC template can’t be modified; we will need one spreadsheet per school. USAC rules also allow you to combine other stand-alone buildings into a single school, as long as certain conditions are met. If a stand-alone building serves just one school (like a HS Gym) and is on the same school property as that school (meaning you can walk from one to the other without crossing a public street) then equipment for that building can be provided on just one spreadsheet. If the building serves more than one school (like a Gym for the ES and HS), or if it’s not located on the same piece of school-owned property it will need its own spreadsheet. If you are unsure if the building in question meets the conditions above, please use a separate spreadsheet and we will figure it out from there. We appreciate your diligence in this process.
Answer:
The “one time eligible cost” field should be the extended cost of each line item.
Answer:
You can submit any other document you want, as long as you fill out the template for the scope of work. We would prefer that you combine your bids into one submission (.zip folders will work) but if you need to submit multiple documents you can hit your refresh button to do so. You will not be DQ’d for submitting additional documents as long as you include the template for each school location.
Answer:
Sure, an additional document would be fine. You’re not required to only submit the template, but the template must be part of your bid submission or your bid will be DQ'd. If you want, you can zip multiple documents into one folder and submit it that way. Otherwise you might have to hit your refresh button to submit more than one.