All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Year18RequiredBMICTemplate57.xlsx |
CaleraY18ICBMIC.docx |
Answer:
Firewall maintenance 1 x Palo-Alto PA500 Firewall/router-located in HS Building For entire District
Switch maintenance 4 x HP ProCurve 4108GL- Located 2-HS, Elem, AG
Switch maintenance 4 x HP ProCurve 2524-Located EC, HS, 2-Elem
Switch maintenance 6 x D-Link DSS24 Located 2-HS, Elem, AG, EC, Gym
Switch maintenance 2 x Linksys SR44 Located in HS
Cat 5e drops Approx. 250
GBIC Approx. 10-4-HS, 2-Elem, 2-AG, EC, Gym
Battery Backup maintenance 11 x Minuteman Enterprise E1500 Battery Backups-5-HS 3-ELEM 3-EC