Answer:
Approximately 30 of the 75 users will be non-classroom positions
Answer:
If I understand this question correctly, we will have approximately 22 phone lines (numbers) coming in to our new facility.
Answer:
We may need to add some new SIP-enabled handsets to serve the additional stations that will be added in our new facility, but we will only be "adding to" our current CISCO VoIP system handsets; we will not be replacing them.
Answer:
We would most likely purchase any additional handsets that are required for our new facility.
Answer:
We will require approximately 125 voice mailboxes.
Answer:
We would be interested in examining any "Receptionist Console Software" proposals.
Answer:
Yes, we will be using system paging.
Our current paging system is Valcom, Model Numbers: VP-4024C and V-2006A
Answer:
There are now floor plans available for download.
Answer:
There are now floor plans available for download.
Answer:
There are now floor plans available for download.
Answer:
There are now floor plans available for download.
Answer:
|
1. & 2. We do not have a "quantity of network drops for each floor..." However, the maximum number of drops will be 35 drops per classroom and 6 drops per office. The room location details are laid out in the submitted PDF files.
.
Re:
|
.
3. There are a maximum number of 8 anticipated areas that will be used as "computer labs/test areas".
These areas will each require approximately 45 network drops.
.
Re:
|
4. We anticipate that we will require approximately 30-35 WAP's throughout our new facility. We do not anticipate having any specific areas that will require additional and/or special wireless coverage.
.
Re:
|
5. Our current "average number of students per classroom" is 24, with a maximum of 28.
.
Re:
|
6. Yes. Our new campus will be replacing our current facilities.
.
Re:
|
.
7. We prefer a site-based wireless controller, but we will consider alternative options.
.
Re:
|
.
8. We recently replaced all of our Aruba WAP's and our Adtran switches with Cisco WAP's and Cisco switches; with excellent results. We now prefer Cisco WAP's and switches.
.
Re:
|
.
9. & 10. The number & type of future racks/cabinets is currently unknown.
We anticipate that there will be a main server room and an additional satellite network closet on the main floor, as well as an auxiliary satellite network closet on the second floor.
.
Re:
|
Answer:
Although our current student count is approximately 850 scholars (students), we expect our student population in the new facility to be approximately 1200 scholars. Our current data connection is 100mb fiber, which we believe will continue to be the case (at a minimum) in the our new facility.