All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
UPDATE 11/12/14: SANGER IS CANCELLING THE C2 PROJECT. THE DISTRICT WILL NO LONGER BE SEEKING A WIRELESS INFRASTRUCTURE UPGRADE OR CABLING. THE SITE VISIT SCHEDULED FOR 11/18/14 IS CANCELLED. THE DISTRICT WILL BE PURCHASING THIS EQUIPMENT PRIOR TO APRIL 1, 2015 (WHICH WILL MAKE IT INELIGIBLE FOR ERATE).
SangerC2proejct.docx |
Answer:
The existing fiber routes are all over the board and some campuses take up to 6 hops to get to the internet. I will accept any proposals that include re-routing fiber to enter the HS directly (where the Internet is).
Answer:
1AP to 2 rooms (Aerohive) at HS, MS, Chisolm Trail. Other campuses have adhoc non-managed consumer based APs. Cabling is needed.
Answer:
5. should read 100 Indian Lane
6. Address is correct.
The existing fiber routes are all over the board and some campuses take up to 6 hops to get to the internet. I will accept any proposals that include re-routing fiber to enter the HS directly (where the Internet is). 5 years is the longest contract we would want to consider.
Answer:
Layer 3, the switches will be provided by school district.
Answer:
I will accept any proposals that include re-routing fiber to enter the HS directly (where the Internet is). Ideally I would like to link directly to 100 Indian Lane since that's were our core router is as well as internet link If not possible, the existing configuration will suffice with some modifications such as fiber splicing to go from MS to HS, skipping 6GC and Annex. 1 Gb handoffs
Answer:
The district has decided to cancel the entire E-rate hardware project. They will not be seeking E-rate funding or applying for any of the C2 project. We apologize for any inconvenience.