All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
SperryC2equipment.xlsx |
SperryDiagrams.pdf |
Answer:
No, none are scheduled, but you are required to bid the entire C2 project.
Answer:
We are not requesting bids for refurbished equipment.
Answer:
The installation off the equipment is not required. The installation of the drops for the wireless is required.
Answer:
We won't know that until the bid deadline has passed and it's not proper competitive bidding behavior to let you know who you are bidding against.
Answer:
Tues Dec. 2, 2014 9:00 to 2:00. Site survey will have to be the week ofter Thanksgiving. Cable must be cat 6 any major vendor. School does not contain asbestos. You may utilize existing pathways. You will need to provide all patch panel. All ceiling have drop tile. All drop will terminate in the middle of each room where the APs will be located. We want cat 6 path cable at both ends of the run.
Answer:
We would prefer that you bid your one best solution.