All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid |
Preferred Make/Manufacturer |
UPS device |
Fredericksburg Primary |
12 |
Tripp Lite/APC or functional equivalent |
UPS device |
Fredericksburg Elementary |
12 |
Tripp Lite/APC or functional equivalent |
UPS device |
Stonewall Elementary |
2 |
Tripp Lite/APC or functional equivalent |
UPS device |
Fredericksburg Middle Sch |
13 |
Tripp Lite/APC or functional equivalent |
UPS device |
Fredericksburg High Sch |
13 |
Tripp Lite/APC or functional equivalent |
2020C2BiddingInstructions87.pdf |
C2CoverPage88.pdf |
NetworkSwitchInventoryFISD.xlsx |
Answer:
We expect 30 minutes of up time for the equipment indicated in the closets on the spreadsheets. The VA capacity to accomplish this is what is being sought.
Answer:
Plan for 2 post rack mounts except for the closets that have more than 3 switches.
We expect 30 minutes of up time for the equipment indicated in the closets on the spreadsheets. The VA capacity to accomplish this is what is being sought.
Answer:
1. We anticipate 50% utilization across the board.
2. Assume primary power supply only in your calculation of kVA.
3. FISD will make arrangements to provide any necessary receptacle changes or additions.
4. The bid should include mounted UPS’s.
5. There is rack space for the UPSs.
6. Yes.
Customarily, we would do a walkthrough. Due to COVID 19 we cannot do that. Quantities and/or types may be changed after the bid is awarded