All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Firewall Service and Components |
High School |
1 |
No Preference |
Firewall Service and Components |
Woods Middle School |
1 |
No Preference |
Wireless Access Points |
Jordan Elementary |
60 |
No Preference |
Wireless Controller |
Jordan Elementary |
1 |
No Preference |
Wireless Access Points |
Pershing Elementary |
50 |
No Preference |
Wireless Controller |
Pershing Elementary |
1 |
No Preference |
Wireless Access Points |
Flynn Park Elementary |
50 |
No Preference |
Wireless Controller |
Flynn Park Elementary |
1 |
No Preference |
Wireless Access Points |
Jackson Park Elementary |
50 |
No Preference |
Wireless Controller |
Jackson Park Elementary |
1 |
No Preference |
Wireless Access Points |
Julia Goldstein Center |
25 |
No Preference |
Wireless Controller |
Julia Goldstein Center |
1 |
No Preference |
2020C2BiddingInstructions4434.pdf |
UniversityCityC2COVERPAGE86.pdf |
Answer:
There will be no walkthroughs.
Answer:
APs are ubiquity lite and pro
Sonicwall firewall
Answer:
We would want the supplies to install and configure the APs. We don't anticipate cabling at this time. We do feel comfortable with our switches handling the POE needs. We do have ladders and lift if needed. This is mostly a swapping out of old for new.