All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Cabling |
Intermediate |
14 |
Network Drops |
Switches |
Intermediate |
1 |
HPE/Aruba JL255A#ABA or functional equivalent |
UPS/Battery Backup |
Intermediate |
2 |
APC BackUp-UPS Pro 1500 or functional equivalent |
Cabling |
Primary |
58 |
Network Drops |
Switches |
Primary |
1 |
HPE/Aruba JL256A#ABA or functional equivalent |
UPS/Battery Backup |
Primary |
4 |
APC BackUp-UPS Pro 1500 or functional equivalent |
Switches |
Garwood Elementary |
1 |
HPE/Aruba JL255A#ABA or functional equivalent |
Switches |
Garwood Elementary |
1 |
HPE/Aruba JL256A#ABA or functional equivalent |
UPS/Battery Backup |
Garwood Elementary |
2 |
APC BackUp-UPS Pro 1500 or functional equivalent |
Switches |
Rice Challenge |
1 |
HPE/Aruba JL256A#ABA or functional equivalent |
Switches |
High School |
1 |
HPE/Aruba JL256A#ABA or functional equivalent |
Switches |
High School |
2 |
HPE/Aruba JL255A#ABA or functional equivalent |
UPS/Battery Backup |
High School |
4 |
APC BackUp-UPS Pro 1500 or functional equivalent |
Switches |
Junior High |
2 |
HPE/Aruba JL256A#ABA or functional equivalent |
UPS/Battery Backup |
Junior High |
1 |
APC BackUp-UPS Pro 1500 or functional equivalent |
Cabling |
Sheridan |
10 |
Network Drops |
2020C2BiddingInstructions1097.pdf |
RiceC2COVERPAGE5.pdf |
Answer:
No
Answer:
No
Answer:
We do need vendors to bid the entire project in order to have their bids considered (not just a portion of the project, such as just the cabling).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade. Bids for individual components of the project/upgrade will be disqualified.