All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Cabling |
Fine Arts to New Gym |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to Old Gym |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to Science Bldg. |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to New HS |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to New Ag Bldg. |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to Fine Arts server room |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Elementary New Wing to Elementary |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Elementary New Wing to Temp 2 |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
INELIGIBLE LOCATIONS |
|
|
Cabling |
Fine Arts to Bus Garage |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to Café |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Fine Arts to Admin |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
Cabling |
Elementary New Wing to Pre-School |
1 |
Single mode fiber, LIU for each building if needed, patch cables. At least 6-strands to each building and/or closet. |
2020C2BiddingInstructions8915.pdf |
SloanC1COVERPAGE.pdf |
SloanC2COVERPAGE66.pdf |
Infofromsitevisits.docx |