All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Pea Ridge School District
IFCB Posted : Jan 2, 2020
Bid Deadline : Wednesday, Feb 19, 2020

Questions Due By : Friday, Jan 17, 2020
Applicant Address : Pea Ridge, AR 72751
IFCB ID : 200010694

IFCB Requirements :
All Questions and Bids must be submitted using the on-line IFCB system. If the IFCB system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
Please include the correct Service Provider Identification Number (SPIN) on your bid.
 
By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
 
Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.
 
Contracts must not prohibit SPIN changes.
 
Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
 
Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period.
 
All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.
 
All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract. 
 
All applicable fees, surcharges, and taxes must be identified on the bid or your bid will be disqualified. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. If the applicant discovers that fees, taxes or surcharges apply but are not listed on the bid (after the time of bid awards) those charges will be the responsibility of the bidding company.
 
LEASED LIT AND DARK FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
CATEGORY ONE NETWORK EQUIPMENT DISQUALIFICATION FACTOR: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid. 
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B. Bids for individual components of a single project will be disqualified. 

Services and Equipment Requested :
UPDATE 1.22.20: Questions and answers from the walkthrough have been added, and the bid deadline has been extended. 

Q.  Does the fiber project include labor?

A. Yes.

 

Q. How many power supplies should be included in the switch on the C1 project?  

A. From the document titled "RFP - Fiber to Primary School - Google Docs.pdf" in the IFCB:

Procurve compatible 48 port switch
/w stacking modules
48 POE+ 1GB ports
4 SFP+ ports capable of 10GB
Ability to be managed by IMC software
> 700W of POE power
Model Aruba 2930M or functional equivalent with removable power supplies

 

Q. How many strands of fiber?

A. In the C1 project: 24.  In the C2 project: 12

 


UPDATE 1/14/2020: We are adding an additional walkthrough date: 1/17/2020 at 10 am. 

CATEGORY ONE
 
MANDATORY SITE VISIT
 
Vendors wishing to submit bids for category one projects must attend one of two mandatory site visits. The site visits will be held on January 9th and January 16th at 11AM. Vendors should report to 1536 North Davis, Pea Ridge, AR 72751, and check in with Keln Taylor. Bids from vendors who did not attend either of the site visits will be disqualified.
 
Leased Wide Area Network Circuit – Connection from the new High School located at 1925 W. Pickens Rd., Pea Ridge, AR 72751; to the Primary School located at 1411 Weston Street, Pea Ridge, AR 72751. Please include pricing for leased switches.
 
Dark leased fiber bidders should bid 24-48 strands of fiber. Lit leased fiber bidders should bid 10Gb-120Gb. 
 
LEASED LIT AND DARK FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
Self-Provisioned Fiber- A fiber run from the Primary School located at 1411 Weston Street, Pea Ridge, AR 72751, to the New High School located at 1925 W. Pickens Rd., Pea Ridge, AR 72751.
 
Category One Network Equipment:
 
(1) Aruba 2930M 48-port POE+ switch w/stacking modules, and removable power supplies, 4 SFP+ ports capable of 10Gb, Procurve compatible, or functional equivalent.
(2) 10Gb single-mode fiber SFP+ modules compatible with above switch. 
 
CATEGORY ONE NETWORK EQUIPMENT DISQUALIFICATION FACTOR: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
INTERNAL CONNECTIONS
 
MANDATORY SITE VISIT
 
Vendors wishing to submit bids for category one projects must attend one of two mandatory site visits. The site visits will be held on January 9th and January 16th at 10AM. Vendors should report to 1536 North Davis, Pea Ridge, AR 72751, and check in with Keln Taylor. Bids from vendors who did not attend either of the site visits will be disqualified.
 
Project A- Cabling
 

Type of Equipment

School Name

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

High School

4

Single mode fiber run between network closets

Cabling

High School

100,000 feet

Cat6 plenum cable


Project B-Hardware

Type of Equipment

School Name

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Antennas, Connectors and Related Components

High School

20

Mount kit and directional antenna’s needed for Aruba AP-534, or functional equivalent

Antennas, Connectors and Related Components

High School

250

Leviton single gang 4-port keystone wallplate white, or functional equivalent

Antennas, Connectors and Related Components

High School

650

Leviton White Cat6 keystone female jacks or functional equivalent

Antennas, Connectors and Related Components

High School

31

Wall-mount 12-port vertical Cat6 110 patch panel

Antennas, Connectors and Related Components

High School

30

24-port Cat6 110 patch panels

Racks

High School

5

2-post standing racks (7’ tall)

Racks

High School

5

Support for 5 racks. Ladder rack and mounting supplies to support cable coming from the floor and from the ceiling to the rack. Rack will be mounted parallel to the wall and 4ft. from the wall.

Switches

High School

15

Aruba 2930M 48-port w/stacking modules. POE+ 1Gb ports, 4 SFP+ ports capable of 10Gb. Ability to be managed by IMC software >700W of POE power, and compatible with procurve hardware, or functional equivalent

Wireless Access Points

High School

50

Aruba AP-515 w/5YR management licenses or functional equivalent

Wireless Access Points

High School

10

Aruba AP-535 w/5YR management licenses or functional equivalent

Wireless Access Points

High School

20

Aruba AP-534 w/5YR management licenses or functional equivalent


NOTE:  The BMIC box has been checked on the 470 in the event that your licenses are considered BMIC (not IC) by USAC.  Bid those costs, if any, under Internal Connections on the cover page.
 
Compatibility Requirement
 
Requested equipment must be compatible with existing HP 5412zl.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A or Project B. Bids for individual components of a single project will be disqualified.
 

There is an additional document associated with this IFCB. Please click the buttons to download the document.

2020C2BiddingInstructions622.pdf
C1IFCBAttachments.zip
C2IFCBAttachments.zip

Questions Received with Applicant Answers   ( Ask Questions? )




Will the school districts IT dept. be doing the programming for the project B- Hardware?

Answer:
 

yes

Is installation needed for Cat6 cabling, Antennas, racks, switches, and wireless access points?

Answer:
 

No installation is requested for the  Cat6 cabling, Antennas, racks, switches, or wireless access points. 

1. Is there symbol legend for the prints? 2. Is there a specific number of cables per location? 3. Are we to supply any patch cords? 4. Is there anymore specifics on the aruba switches and AP's?

Answer:
 

1. Is there symbol legend for the prints?

Yes.  On page 3 of the PDF titled "System Plan.pdf".

 

2. Is there a specific number of cables per location?

It isn't relevant as we not requesting that cat 6 cable and equipment be installed.   The only thing that we are asking to be installed if the fiber between IDF's as detailed in the document titled "RFP - Internal Fiber Runs - Google Docs.pdf".

 

3. Are we to supply any patch cords?

no

 

4. Is there anymore specifics on the aruba switches and AP's? 

We are not asking for the installation of the switches and AP's   What specifics would you like to know?

There are multiple models of each AP and switch. How do we know which specific model is spec'd?

Answer:
 

The information we have posted are all of the details we have at this point.

 

Switches

High School

15

Aruba 2930M 48-port w/stacking modules. POE+ 1Gb ports, 4 SFP+ ports capable of 10Gb. Ability to be managed by IMC software >700W of POE power, and compatible with procurve hardware, or functional equivalent

Wireless Access Points

High School

50

Aruba AP-515 w/5YR management licenses or functional equivalent

Wireless Access Points

High School

10

Aruba AP-535 w/5YR management licenses or functional equivalent

Wireless Access Points

High School

20

Aruba AP-534 w/5YR management licenses or functional equivalent

CRW Consulting here - below are the Q&As from site visits.

Answer:
 

Q. Are you accepting partial bids?

A. No.  We require bids of a complete project.  Ie project A or project B.

 

Q. When will the school be done?

A. We plan to be moved in the Fall of 2020.

 

Q. Who is the general contractor for the new high school?

A. CR Crawford

 

Q. Will there be a possibility that we have to do the projects in phases.

A.  Yes.

 

C2 Project A Questions

Q. Do you just want a "hand-off" of the Cat6 plenum cable in ProjectA?

A. Correct. Delivery only.

 

Q. Do you have a preference on the color of the Cat6 cable?

A. Blue or gray is fine.

 

Q. Are there estimates of the length of the interior fiber runs?

A. There are not. I have provided system drawings with the IFCB.

 

Q. Will the J hooks already be in place?

A. The electrical contractor is installing the J hooks.

 

 

C2 Project B Questions

Q. How much ladder rack do you need?

A.  The information on the IFCB is all I can provide.  

Racks

High School

5

Support for 5 racks. Ladder rack and mounting supplies to support cable coming from the floor and from the ceiling to the rack. Rack will be mounted parallel to the wall and 4ft. from the wall.

 


Q. Will a 4 foot piece and a 10 foot piece of ladder rack work for each closet.?

A. No.  In addition to regular ladder rack, we also need the vertical bend pieces to support cable coming from below and above for the network closets on the second floor and just above for the network closets on the first floor.

 

 

Q. Does any of the material on project B need to be installed?

A. No.  Delivery only.

 

 

C1 Questions

 

Q. Do we need to install tracer wire along with the fiber in the conduit?

A. Yes.  12 gauge copper wire

 

Q. How many underground enclosures will there be.

A. I don't have a an exact amount yet, but I estimate 15.