All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, Connectors and Related Components |
Elementary |
5 |
GBICs |
Cabling |
Elementary |
2 |
Stacking Cables |
Racks |
Elementary |
1 |
Rack to house 1 switch |
Switches |
Elementary |
7 |
Aruba 2930M 48-port POE or functional equivalent |
Antennas, Connectors and Related Components |
High School |
3 |
GBICs |
Cabling |
High School |
2 |
Stacking cables |
Switches |
High School |
6 |
Aruba 2930M 48-port POE or functional equivalent |
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Switches |
Elementary |
7 |
Aruba 2930M |
Switches |
Elementary |
1 |
HP 5412 zl2 core switch |
Switches |
High School |
6 |
Aruba 2930M |
Switches |
High School |
1 |
HP 5412 zl2 core switch |
2020C2BiddingInstructions27.pdf |
SouthSideC2COVERPAGE29.pdf |
Year2320202021WalkthroughGeneralInformation.zip |
Answer:
We do not have an existing contract for Managed Internal Broadband services. Expectations for MIBs would be to ensure that all necessary updates (software/firmware/patches) are installed in a timely manner, notify school district when updates are installed or work is performed on the switches, and vendor provide monitoring of switches.
MIBS for the requested equipment should be broken out as a separate quote.