All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
UPDATE 11/7/19: A network diagram is now available to download.
UPDATE 11/7/19: The C1 cover page is only required if bidding C1 equipment. The disqualification statement has been corrected.
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Switches |
High School |
7 |
Cisco 48-port POE or functional equivalent |
UPS/Battery Backup |
High School |
4 |
APC SmartUPS 3000 or functional equivalent |
Switches |
Middle School |
3 |
Cisco 48-port POE or functional equivalent |
UPS/Battery Backup |
Middle School |
2 |
APC SmartUPS 3000 or functional equivalent |
Switches |
Elementary |
3 |
Cisco 48-port POE or functional equivalent |
UPS/Battery Backup |
Elementary |
3 |
APC SmartUPS 3000 or functional equivalent |
2020C2BiddingInstructions8367.pdf |
AbernathyC1COVERPAGE.pdf |
AbernathyC2COVERPAGE.pdf |
AbernathyNetworkDiagram.pdf |
Answer:
Yes, please include Stacking Modules to be compatible with either existing equipment, or future upgraded switches
Answer:
The ACD is the Allowable Contract Date that is generated by USAC after the form 470 is posted and it is 28 days after that form gets posted. The bid deadline on the IFCB is the actual bid deadline for our project.
Answer:
Neither the C1 or C2 cover page is asking for pricing information for lit or dark fiber. If you are bidding just leased dark or leased lit fiber you don’t have to fill out a cover page. If you are bidding the C1 equipment you do need to complete the C1 cover page.