All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Mulberry Public School District
IFCB Posted : Oct 23, 2019
Bid Deadline : Tuesday, Dec 3, 2019

Questions Due By : Saturday, Nov 2, 2019
Applicant Address : Mulberry, AR 72947
IFCB ID : 200002430

IFCB Requirements :
All Questions and Bids must be submitted using the on-line IFCB system. If the IFCB system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
 
Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
 
Please include the correct Service Provider Identification Number (SPIN) on your bid.
 
By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
 
Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.
 
Contracts must not prohibit SPIN changes.
 
Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
 
Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period.
 
All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.
 
All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract. 
 
All applicable fees, surcharges, and taxes must be identified on the bid or your bid will be disqualified. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. If the applicant discovers that fees, taxes or surcharges apply but are not listed on the bid (after the time of bid awards) those charges will be the responsibility of the bidding company.
 
E-rate rules require applicants to evaluate the cost of eligible goods and services and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.
 
INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
WAN CONNECTIONS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
CATEGORY ONE NETWORK EQUIPMENT DISQUALIFICATION FACTOR: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid. 
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified.

Services and Equipment Requested :
Category One
 
Category One Network Equipment
 
3 Ubiquiti Edge Switches, Layer 3, VLan capable, minimum of 12 Ethernet ports, minimum of 2 SFP ports, and rack mountable. Applicant will accept functional equivalent.

CATEGORY ONE NETWORK EQUIPMENT DISQUALIFICATION FACTOR: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
Internet Access – Minimum 300Mbps bandwidth, maximum 1Gbps bandwidth. Please include bids for 500Mbps bandwidth. Please also include bids for 1 and 3 year terms.  The terminating address for this circuit is 1319 N. Main St., Mulberry, AR 72947; (479)997.  E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request.  If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services. 
 
NOTE: Per USAC’s current guidance about applying for Internet access this applicant is checking the Leased Lit Fiber, Internet Access: ISP Service only and Internet Access and Transport Bundled. 
 
INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
WAN Connections- Leased Lit Fiber please provide bids for 300Mb, 500Mb, and 1Gb bandwidths.  Leased Dark Fiber please provide bids for 4 and 6 strands.  Please include 3, 5, and 10 year terms. 
 
Hub- Mulberry High School, 203 W 5th Street, Mulberry, AR 72947 to the following locations:
 
Pleasant View Junior High- 5750 Hornet Lane, Mulberry, AR 72947
Marvin Primary- 1319 N. Main Street, Mulberry, AR 72947
 
WAN CONNECTIONS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
 
 
 
 
 
Internal Connections

Type of Equipment

School Name

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

UPS/Battery Backup

Pleasant View Jr. High

4

APC or Eaton/1000-3000VA or functional equivalent

UPS/Battery Backup

Marvin Elementary

4

APC or Eaton/1000-3000VA or functional equivalent

UPS/Battery Backup

Mulberry High School

3

APC or Eaton 1500+VA or functional equivalent


Compatibility Requirement
 
Equipment must be no larger than 2U and be rack mountable to be compatible.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project/upgrade.  Bids for individual components of the project/upgrade will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Bids that include equipment that were manufactured for use outside of the United States will be disqualified.
 

There is an additional document associated with this IFCB. Please click the buttons to download the document.

2020C2BiddingInstructions4214.pdf
MulberryC1COVERPAGE.pdf
MulberryC2COVERPAGE56.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Can you provide a list of equipment to be supported by each UPS? Minimum runtime?

Answer:
 

2-4 POE Switches between 24-48 port. Minimum runtime 30min.

I am reaching out in regards to the 470 that was released for Mulberry Public Schools in Arkansas for some battery backup products and I have a few questions. • What are the power requirements (120V or 208V) and what receptacles are available at your customer’s location? • How much runtime is your customer requiring? • What is the total wattage or power draw? •  And are they looking for a centralized UPS or multiple UPS’s to back up all of their devices?

Answer:

Power requirements:

120v

 

Receptacles:

15 Amp Standard Duplex Wall Outlet  

 

Runtime:

30 Minutes minimum. 

 

Total Power draw:

Power draw will not exceed 750w

 

Multiple UPS's are needed. *See ''Quantity Vendor Should Bid"