All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Woodland School District I-90
IFCB Posted : Oct 21, 2019
Bid Deadline : Thursday, Dec 5, 2019

Questions Due By : Thursday, Nov 7, 2019
Applicant Address : Fairfax, OK 74637
IFCB ID : 200002219

IFCB Requirements :
All Questions and Bids must be submitted using the on-line IFCB system. If the IFCB system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
 
Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
 
Please include the correct Service Provider Identification Number (SPIN) on your bid.
 
By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
 
Bidder is expected to provide the lowest corresponding price per E-rate rules.  See http://www.usac.org/sl/service-providers/step02/lowest-corresponding-price.aspx for details.
 
Contracts must not prohibit SPIN changes.
 
Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
 
Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period.
 
All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.
 
All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract. 
 
All applicable fees, surcharges, and taxes must be identified on the bid or your bid will be disqualified. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. If the applicant discovers that fees, taxes or surcharges apply but are not listed on the bid (after the time of bid awards) those charges will be the responsibility of the bidding company.
 
The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid. 
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project D, Project E, Project F, or Project G.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.  
 
DISQUALIFICATION FACTOR MIBS: Service providers are required to bid an entire Project H, Project I, or Project J.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

Services and Equipment Requested :
INTERNAL CONNECTIONS
 
INTERNAL CONNECTIONS:  There is another document associated with this IFCB available for download that details the equipment the applicant wishes to purchase.  The document lists equipment that the applicant prefers – they will also accept functional equivalents of said items. 
 
NOTE:  The BMIC box has been checked on the 470 in the event that your licenses are considered BMIC (not IC) by USAC.  Bid those costs, if any, under Internal Connections on the cover page.
 
Project Narrative
 
The District is requesting installation on all requested components.
 
VOLUNTARY SITE VISIT
 
Vendors wishing to bid on internal connections can attend a voluntary site visit on October 30th or November 6th at 11am. Vendors will meet at the main building located at 100 N. 6th Street, Fairfax, OK 74637, and check in with Chris Tuter.
 
Compatibility Requirement
 
All requested equipment must be compatible with existing Ubiquiti hardware. 
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
 
 
BASIC MAINTENANCE OF INTERNAL CONNECTIONS
 
BMIC:  There is another document associated with this IFCB available for download that lists the equipment to be maintained.
  
DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project D, Project E, Project F, or Project G.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 
DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.  
 
MANAGED INTERNAL BROADBAND SERVICES
MIBS:  There is another document associated with this IFCB available for download that lists the existing equipment to be maintained. 
 
DISQUALIFICATION FACTOR MIBS: Service providers are required to bid an entire Project H, Project I, or Project J.  Bids for individual components of a single project will be disqualified.
 
DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
 

There is an additional document associated with this IFCB. Please click the buttons to download the document.

2020C2BiddingInstructions1330.pdf
WoodlandC2COVERPAGE70.pdf
WoodlandC2Attachment.xlsx

Questions Received with Applicant Answers   ( Ask Questions? )




Cabling - Do you have maps showing locations of cabling and rack locations? Cabling - What is the building construction - type of walls (sheet rock or cinder block), type of ceiling (solid or drop)? Cabling - Are any of the drops going in gyms, cafeteria, safe rooms, etc.? Routers - Are these Internet routers or routing switches to be at the 4 sites (ES, MS, HS and Alternative)? Routers - There is only 1 Cisco router in place now, correct? Wireless Access Points - Are you adding to an existing Ubiquiti wireless network or replacing?

Answer:
 

We do not have a map of current cabling.  All cabling terminates in the server room, centrally located in the building. Cabling is Cat6.  Ceilings are drop ceilings. Walls are both sheet rock and cinder block. Access through the cinder block walls has already been performed.

There may be some AP drops in the Gym and workout room. 

There is one Cisco router managed by Windstream. There is one Juniper FW Router.  Swithches are managed switches with sub-netting.

We are adding to AP's to existing Ubiquiti network. Need managing of existing SummittExtreme WiFi in addition.