All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
2020C2BiddingInstructions55.pdf |
PerthAmboyC2COVERPAGE.pdf |
PerthAmboyC2Attachment.xlsx |
Answer:
1. Will a bond be required at the time bid submittal or upon award? Yes, we specified a 1 Million bond for the project
2. Will all existing wireless infrastructure be replaced by the products provided in this bid? Yes, We currently have an Extreme wireless infrastructure that will be upgraded.(virtual controllers) and Access points.
Answer:
The Bond would only be needed if you are awarded the bid.
Answer:
Walkthroughs were scheduled for 10/29 and 10/31.
Answer:
1. Do you want the additional costs for 1 year support on the virtual appliance's?
No, we are currently under support for the virtual appliances.
2. We were told by Extreme that the district wants to contract for Extreme Professional Services. Do you want a separate quote for this?
Please include that in the bid if using extreme for professional services to upgrade the appliances.
Answer:
1.) What optics are used between MDF and IDF closets and the bandwidth?
We are using Extreme LRM optics with dual 10gb Links
2.) What type of connection do you have to each building to the core
We have all district owned dark fiber between the distribution layer and Core
3.) Will a channel plan and heat map be required?
Yes, we require both.
4.) Do all switches have POE and the density for POE plus?
Yes, All switches have dual 1100w power supplies so they have the budget for both POE and POE plus.
5.) If an AP is in the wrong location after the analysis is made will they be responsible to move it.
Most of our AP’s have a service loop in place so we will have to adjust based on the scenario. If the move is out of scope the district will cover the cost.
6.) Are all patch panels CAT6 for wireless.
Yes, all current wire and patch panels are cat6 to the wireless infrastructure.
7.) Are the vendors required to run all wire in conduit?
Conduit is required for all hard ceilings. If there is a drop ceiling you can use J-Hooks with plenum rated wire.
8.) Are floor plans available.
Yes, We can provide floor plans to the bid winner with AP locations.
9.) How many SSID’s do you have.
We have 3 SSID’s. PAPSx (802.1x), PAPSk (used for onboarding WPA2), BYOD (used for staff and vendors through a portal)
10.) What type of switches are used to connect the AP’s
Distribution layer switches are 460G2 with dual 1100w power supplies.
11.) What are the average run lengths for the requested wiring.
Run lengths will vary but IDF closets are within 300ft of the requested drops.