All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid |
Preferred Make/Manufacturer |
Cabling |
Primary k-2 |
23 |
Cat6 cable drops (20 for new wing addition) |
Racks |
Primary k-2 |
1 |
No preference |
Switches |
Primary k-2 |
2 |
10Gb Aruba (1 POE for AP and 1 for wall drops) or functional equivalent |
UPS device |
Primary k-2 |
1 |
APC Smart 750VA LCD Rackmount (for new addition) or functional equivalent |
Wireless Access Points |
Primary k-2 |
23 |
Aruba Instant IAP-305 (20 for new wing addition) or functional equivalent |
Cabling |
Elementary 3-5 |
2 |
Cat6 cable drops |
Wireless Access Points |
Elementary 3-5 |
2 |
Aruba Instant IAP-305 or functional equivalent |
Cabling |
Middle School 6-8 |
2 |
Cat6 cable drops |
Wireless Access Points |
Middle School 6-8 |
2 |
Aruba Instant IAP-305 or functional equivalent |
Cabling |
High School 9-12 |
5 |
Cat6 cable drops |
Wireless Access Points |
High School 9-12 |
5 |
Aruba Instant IAP-305 or functional equivalent |
UPS/Battery Backup |
High School 9-12 |
1 |
APC Smart 750VA LCD Rackmount or functional equivalent |
2020C2BiddingInstructions48.pdf |
SouthernBooneC2COVERPAGE26.pdf |
SBCQAfromWalkthroughs.pdf |
Maps.pdf |
Answer:
Cabling should be bulk UTP CAT6A, solid core, plenum, and preferably white jacket.
Connectors should be RJ45, and/or CAT6A modules.
Patch cords should be an assortment, but I would recommend 5' & 10' patch cables.
Answer:
The Internal connections is all one project and vendors are required to bid all items, including cabling drops.
Answer:
We need to insure the equipment racks are 19" racks that will support 24U, or more.