All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment |
School Name |
Quantity Vendor Should Bid |
Preferred Make/Manufacturer |
Firewall Service and Components |
Elementary |
1 |
Fortigate or functional equivalent |
Switches |
Elementary |
8 |
Extreme 48-port 10Gb or functional equivalent |
Switches |
Middle School |
1 |
Extreme 48-port 10Gb or functional equivalent |
Cabling |
High School |
1 |
¼ mile fiber run |
Switches |
High School |
5 |
Extreme 48-port 10Gb or functional equivalent |
Wireless Access Points |
High School |
1 |
Extreme or functional equivalent |
Type of Equipment |
School Name |
Quantity Vendor Should Bid |
Preferred Make/Manufacturer |
Switches |
Elementary |
8 |
Extreme 48-port 10Gb licenses |
Switches |
Middle School |
1 |
Extreme 48-port 10Gb licenses |
Switches |
High School |
5 |
Extreme 48-port 10Gb licenses |
Wireless Access Points |
High School |
1 |
Extreme license |
Type of Equipment |
School Name |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Caching Server |
Elementary |
11 |
Virtual Servers |
Caching Server |
Elementary |
1 |
Dell PowerEdge R730 |
Firewall Service and Components |
Elementary |
1 |
Juniper SRX300 |
Switches |
Elementary |
7 |
Extreme X440-48 |
Switches |
Elementary |
3 |
HP ProCurve 1810G |
Wireless Access Points |
Elementary |
6 |
Aruba 105 |
Switches |
High School |
2 |
Extreme X440-48 |
Switches |
High School |
3 |
HP ProCurve 1810G |
Wireless Access Points |
High School |
9 |
Aruba 225 |
Wireless Access Points |
High School |
3 |
Aruba 205 |
Wireless Access Points |
Middle School |
2 |
Aruba 205 |
OklahomaUnionC2COVERPAGE23.pdf |
2020C2BiddingInstructions2432.pdf |
OklahomaUnionMIBSAttachment.xlsx |
OKUFloorPlans.pdf |
Answer:
1. Extreme X440-G2-48P Part Number 16535
2. 3 year for Fortigate
3. 3rd party will be an option
Answer:
We are going to cancel the request for the ¼ mile fiber run. It is actually a Category One fiber run, not C2. We will file a new 470 and IFCB for that fiber run soon. Vendors do not need to bid the fiber run requested on this IFCB.
Answer:
We are going to cancel the request for the ¼ mile fiber run. It is actually a Category One fiber run, not C2. We will file a new 470 and IFCB for that fiber run soon. Vendors do not need to bid the fiber run requested on this IFCB.