All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Cabling
|
High School
|
13
|
Cat6 Ethernet Drops for AP’s, please provide patch panels as well.
|
Cabling
|
Middle School
|
18
|
Cat6 Ethernet Drops for AP’s, please provide patch panels as well.
|
Cabling
|
Elementary
|
18
|
Cat6 Ethernet Drops for AP’s, please provide patch panels as well.
|
Wireless Access Points
|
High School
|
10
|
Aruba 340 series Indoor AP or functional equivalent
|
Wireless Access Points
|
High School
|
3
|
Aruba 340 series Outdoor AP or functional equivalent
|
Wireless Access Points
|
Middle School
|
14
|
Aruba 340 series Indoor AP or functional equivalent
|
Wireless Access Points
|
Middle School
|
4
|
Aruba 340 series Outdoor AP or functional equivalent
|
Wireless Access Points
|
Elementary
|
16
|
Aruba 340 series Indoor AP or functional equivalent
|
Wireless Access Points
|
Elementary
|
2
|
Aruba 340 series Outdoor AP or functional equivalent
|
2019C2BiddingInstructions69.docx |
C2COVERPAGE285.pdf |
APLocationMap.pdf |
111918questionsanswers.pdf |
Answer:
We do not have a controller in place. We are currently using Aruba Instant AP’s. We are adding on to our current system to fill in some low signal areas.
Answer:
we are requesting a leased circuit from the service provider, not district owned