All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
High School
|
4
|
24-port POE
|
Switches
|
High School
|
5
|
48-port POE
|
UPS/Battery Backup
|
High School
|
2
|
1500 model rack mountable or functional equivalent
|
UPS/Battery Backup
|
High School
|
2
|
750 model rack mountable or functional equivalent
|
Wireless Access Points
|
High School
|
20
|
Engenius or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
Middle School
|
3
|
48-port POE
|
UPS/Battery Backup
|
Middle School
|
1
|
1500 model rack mountable or functional equivalent
|
UPS/Battery Backup
|
Middle School
|
1
|
750 model rack mountable or functional equivalent
|
Wireless Access Points
|
Middle School
|
15
|
Engenius or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Switches
|
Elementary
|
5
|
24-port POE
|
Switches
|
Elementary
|
2
|
48-port POE
|
UPS/Battery Backup
|
Elementary
|
1
|
1500 model rack mountable or functional equivalent
|
UPS/Battery Backup
|
Elementary
|
3
|
750 model rack mountable or functional equivalent
|
Wireless Access Points
|
Elementary
|
18
|
Engenius or functional equivalent
|
Type of Equipment
|
School Name
|
Number of Devices Vendor Should Bid
|
Preferred Make/Manufacturer
|
Firewall Service and Components
|
District Shared
|
1
|
No Preference
|
Wireless Controller
|
District Shared
|
1
|
No Preference
|
2019C2BiddingInstructions6556.docx |
C2COVERPAGE4764.pdf |
Answer:
We do not have a preferred topology. We want the most cost effective method that will work and give us increased bandwidth while also connecting all three sites.
UPS-line interactive
POE+